BIPPL small scale renewable energy project
#1349of 1935 in Renewable energy#724of 975 in India#1075of 1459 in CDM (UNFCCC)
Audit Analysis
A small-scale hydro project in India validated under CDM with a confirmed investment additionality test and jurisdictional baseline, but the validation report identified 17 material findings requiring correction, and no monitoring or verified emissions data is available in the extracted record. The project's integrity is moderate given the extensive initial documentation issues, while transparency is limited by the absence of any monitoring reports or verified ERR figures.
Red Flags
- 17 material findings and 21 corrective actions were required at validation, including inconsistent baseline emissions calculations, incorrect financial indicator calculations, and unsupported barriers in the PDD
- No monitoring reports or verified emissions reduction figures are available in the extracted record, making it impossible to confirm actual delivery against the 214,329 tCO2e lifetime claim
- Leakage was deemed negligible with a 0% deduction but no quantified justification or sensitivity analysis was provided
- Low extraction confidence indicates at least one key document was poorly readable, reducing reliability of the extracted data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Hydro project, no reversal risk
0% deemed negligible, not quantified
Jurisdictional grid EF 0.84 (2009)
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →