Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

VMR0017 — Grid-connected electricity generation from renewable sources (ACM0002 Revision)

About this methodology

Projects generate grid-connected electricity from renewable sources, with or without energy storage. The method measures emissions displaced on the grid and deducts relevant project and lifecycle emissions.

Version
1.0 · source ·
Status
Active at Verra / Verified Carbon Standard · source ·
Climate outcome
Emission reductions
Activity
Electricity
ICVCM Core Carbon Principles
  • Approved by the ICVCM for Verified Carbon Standard, version(s) 1.0 (source) ·
Official page
verra.org ·

Approval applies to the programs and versions listed. The official decision and project-specific conditions must also be met for credits to carry a CCP label; this is not a label for the projects on this page.

How our current method reads projects of this type

No rule is specific to this methodology: only the general rules apply. Read the general rules.

History and transitions

  • v1.0active from 23 Apr 2026currentsource

    This methodology revision primarily expands the geographic eligibility of project activities, introduces provisions to determine project emissions due to battery energy storage system (BESS) fire suppression systems, considers leakage due …

Projects using VMR0017

Browse 22 published projects using VMR0017, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under VMR0017?

In CarbonMeld's data, VMR0017 projects are on one registry: Verra (22 projects, 0 registered).

RegistryProjectsRegisteredProjects list
Verra (VCS)220See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database