Skip to main content
CDMWindIndiaGeneral Methodologyv2.1

1.85 MW Bundled Wind Power Generation in Tamil Nadu

CDM-4998 ↗

#735of 1935 in Renewable energy#361of 975 in India#503of 1459 in CDM (UNFCCC)

5.4/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
6.0
Documentation
4.0

Audit Analysis

A standard 1.85 MW bundled wind project under CDM methodology AMS.I.D with a VVB-verified investment additionality test and a jurisdictional grid baseline. The fundamentals are sound, but the available record lacks monitoring and verification data, the extraction confidence is low, and a minor contradiction exists on the leakage treatment, limiting confidence in the full credit lifecycle.

Red Flags

  • No monitoring or verification reports were found in the extracted record; actual credit delivery (total ERR verified) cannot be confirmed against the 43,120 tCO2e claimed.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted facts.
  • A contradiction exists on the leakage justification: the validation report states 'deemed negligible' while an undated, unidentified document references a 'quantified' treatment.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified investment test

Permanence

Avoidance project

Leakage

0% deduction, deemed negligible; minor contradiction

Baseline

Jurisdictional grid EF (0.94479, 2009)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents