10MW Hydroelectric Power Project at Munirabad, Karnataka
#1339of 1935 in Renewable energy#713of 975 in India#1059of 1459 in CDM (UNFCCC)
Audit Analysis
A 10 MW hydro project in Karnataka with a jurisdictional baseline and VVB-confirmed investment additionality test, but undermined by a seven-fold discrepancy in claimed emissions reductions between the PDD and validation report, seven material findings raised during validation, and a complete absence of monitoring or verified-credit data. The leakage treatment (0% deduction) is contradicted by an earlier appendix that described it as quantified, and no permanence or buffer mechanism is documented.
Red Flags
- ERR contradiction: the validation report (Apr 2015) states 9,840 tCO₂e while the PDD (Dec 2014) states 68,880 tCO₂e — a 7× gap that is never reconciled in the available documents
- Seven material findings (CAR-01 through CAR-07) were raised during validation, including an altered PDD template, an outdated emission-factor tool, and a missing energy-flow diagram
- Leakage justification is inconsistent: the validation report calls it 'deemed negligible' while a 2012 appendix describes it as 'quantified'
- No monitoring report, monitoring period, or verified ERR figure is present in the extracted record
- Grid emission factor is fixed at 0.8418 tCO₂/MWh from 2012 with no evidence of periodic updating
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction; justification contradicts earlier appendix
Jurisdictional grid EF (0.8418, 2012)
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not found
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →