Vai al contenuto principale
VCS avoidance India Vintage 2012 Registry: Late to verify Documentazione completa General Methodology v2.0

15 MW Solar Photovoltaic Power Project At Gujarat

VCS-1578 ↗

4.6 / 10
Integrity
4.4
Transparency
4.8
Claim Safety
5.0
Documentation
4.3

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB in the monitoring report, and the project is an avoidance-type solar project under AMS.I.D.

missing The monitoring report lists multiple corrective actions, and the baseline is project-specific with no reassessment date stated.

Transparency

verified The monitoring report provides a monitoring period and exact claimed versus verified emission reductions, which match at 18,207 tCO2e.

missing Safeguards are not documented in the monitoring report, and usage monitoring is not stated in the extracted record.

Claim Safety

verified The project is a renewable electricity avoidance project with no leakage deduction and a quantified grid emission factor.

missing The baseline is project-specific rather than jurisdictional, and the contradictory crediting-period records reduce confidence in claim precision.

Documentation

verified Multiple official documents were used, including the PDD, validation report, monitoring report, and issuance record.

missing The extraction confidence is high, but the monitoring report still contains several corrective actions and some key fields are not stated.

Detailed Analysis

Integrity

The monitoring report confirms additionality was verified by the VVB, which is a meaningful positive for a VCS solar avoidance project. On the other hand, the project uses a project baseline, the baseline reassessment date is not stated, buffer pool coverage is not found, and reversal handling is marked as not addressed, though reversal risk is inherently limited for solar generation. Multiple corrective actions in the monitoring report, including discrepancies in the ER sheet and incomplete monitoring report aspects, weaken confidence in the robustness of the accounting.

Transparency

The monitoring report gives a clear monitoring period and reports 18,207 tCO2e claimed and 18,207 tCO2e verified, which is a positive sign for MRV consistency. However, usage monitoring is not stated, and the extracted record does not show a complete public-facing safeguards package. The VVB is named as Earthood Services Private Limited, but the overall disclosure quality is only moderate because several operational details are missing.

Claim Safety

Claim safety is moderate because this is a renewable electricity avoidance project with a quantified grid emission factor and no leakage deduction, which reduces over-crediting concerns. Still, the baseline is project-specific rather than standardized, and the record does not show a recent baseline reassessment. The project is marked as not CORSIA-eligible, which lowers dual-market claim risk, but the contradictory crediting-period entries create some uncertainty about the exact issuance window.

Documentation

The record draws on several official documents, including issuance, PDD, validation, and monitoring materials, which supports a reasonable documentation base. Even so, the monitoring report required multiple corrective actions, and several important items are not stated, including buffer pool coverage, usage monitoring, and a quantified additionality test type. Extraction confidence is high, so the main limitation is document completeness rather than readability.

Overall

The project looks like a reasonably credible solar avoidance crediting case, but not a high-confidence one. I privileged the monitoring report for the later crediting-period and safeguards statements because it is more recent than the validation report, while noting the contradiction that the validation report shows a different crediting period and apparently stronger safeguards disclosure; this inconsistency lowers reliability. I also privileged the monitoring report’s leakage treatment of a deemed-negligible 0% deduction over the earlier validation reference to quantified leakage, because the later document is more specific to the monitored period, but the mismatch still warrants a downward adjustment.

Audit Analysis

This is a solar avoidance project with VVB-verified additionality and no reported leakage deduction, which supports a moderate integrity profile. However, the record has several corrective actions, a project-specific baseline, no stated buffer pool, and weak safeguards documentation, which keeps confidence only moderate.

Project Description

This carbon project generates renewable electricity that is connected to the grid and is categorized as Type I under the Clean Development Mechanism and approved by the VCS board. This project is not a grouped project and more information can be found in section A.6 of the registered PDD.

Red Flags

  • Multiple corrective actions were required in the monitoring report, including discrepancies in the ER sheet and incomplete monitoring report aspects.
  • Safeguards are weakly documented: no FPIC, no grievance mechanism, and the monitoring report says safeguards were not mentioned.

Credit Vintages Exhausted

Issued Retired Available
2012
18,207 18,207 0
Total 18,207 18,207 0

Cosa migliorerebbe questo punteggio

  • Provide a complete, dated safeguards package covering FPIC, grievance handling, and community benefit-sharing, or clearly document why these are not applicable.
  • Publish a clearer baseline and monitoring trail, including baseline reassessment timing, leakage rationale for the monitored period, and resolution of the crediting-period contradiction.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Avoidance project, no reversal events reported

Leakage

Leakage deemed negligible with 0% deduction

Baseline

Project baseline, reassessment not stated

Safeguards

No safeguards or grievance mechanism documented

Double-claim

Not CORSIA-eligible and no CCP status stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti