2.1 MW wind power project of Jose Thomas Pattara at Tamil Nadu, India

CDM-4976 ↗

#469of 1935 in Renewable energy#240of 975 in India#304of 1459 in CDM (UNFCCC)

5.8/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
4.0

Audit Analysis

A straightforward 2.1 MW CDM wind project in Tamil Nadu with a sound investment-test additionality assessment and jurisdictional grid baseline, but limited post-validation documentation and low extraction confidence constrain confidence in the full project record. All ten material findings from the validation report were resolved without outstanding corrective actions, and the claimed emission reductions are consistent with the installed capacity and Indian grid emission factor.

Red Flags

  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted record.
  • No monitoring or verification reports were found in the available documents, so actual verified emission reductions cannot be compared against the 46,820 tCO2e lifetime claim.
  • A contradiction exists on leakage treatment: the validation report states leakage was deemed negligible while a financial document references a quantified leakage figure; the undated financial document is less authoritative.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind displacement – no reversal risk

Leakage

Negligible – appropriate for wind

Baseline

Jurisdictional grid EF (2008)

Safeguards

Mentioned but not detailed

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents