2.1 MW wind power project of Jose Thomas Pattara at Tamil Nadu, India
#469of 1935 in Renewable energy#240of 975 in India#304of 1459 in CDM (UNFCCC)
Audit Analysis
A straightforward 2.1 MW CDM wind project in Tamil Nadu with a sound investment-test additionality assessment and jurisdictional grid baseline, but limited post-validation documentation and low extraction confidence constrain confidence in the full project record. All ten material findings from the validation report were resolved without outstanding corrective actions, and the claimed emission reductions are consistent with the installed capacity and Indian grid emission factor.
Red Flags
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted record.
- No monitoring or verification reports were found in the available documents, so actual verified emission reductions cannot be compared against the 46,820 tCO2e lifetime claim.
- A contradiction exists on leakage treatment: the validation report states leakage was deemed negligible while a financial document references a quantified leakage figure; the undated financial document is less authoritative.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Wind displacement – no reversal risk
Negligible – appropriate for wind
Jurisdictional grid EF (2008)
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →