6.25 MW grid-connected Sattegala Mini Hydel Scheme at SLS Power Industries Ltd., in Chamarajanagar District, Karnataka
#152of 387 in India#53of 213 in CDM (UNFCCC)#73of 417 in AMS-I.D
Audit Analysis
A 6.25 MW grid-connected mini-hydro project in Karnataka validated under CDM AMS-I.D. v18.0 with a jurisdictional baseline and combined additionality test. The project is structurally sound for its type, but the absence of any monitoring data, a seven-fold discrepancy between the PDD and validation report on estimated CERs, and the lack of a buffer pool or permanence safeguard create meaningful uncertainty about the robustness of the credit claims.
Red Flags
- The PDD (Feb 2022) estimates 170,436 CERs while the validation report (Mar 2022) validates only 24,348 — a 7× discrepancy that is not explained in the extracted record and raises over-crediting concerns in the original project design.
- No buffer pool or permanence safeguard is documented for a 7-year crediting period, leaving the project exposed to reversal risk from drought, dam failure, or operational changes with no credit backstop.
- No monitoring report or monitoring period data is present in the extracted record, so actual performance against the validated 24,348 CERs cannot be assessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 3,297 | 0 | 3,297 | |
| 2013 | 13,147 | 0 | 13,147 | |
| 2022 | 131,388 | 0 | 131,388 | |
| Total | 147,832 | 0 | 147,832 |
Risk Indicators
Combined test present but VVB confirmation not explicitly ex
No buffer pool; hydro reversal risk unmitigated
0% deduction justified as negligible for grid-connected gene
Jurisdictional grid EF (0.8864, 2021), reassessed 2022
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →