8.35 MW Wind Power Project at Guddarangavana Halli, District Chitradurga, State Karnataka, India.
#744of 1935 in Renewable energy#370of 975 in India#442of 1339 in Verra (VCS)
Audit Analysis
A standard 8.35 MW grid-connected wind project under AMS.I.D with a verified investment-test additionality and a jurisdictional grid emission factor baseline. The verified ERR (75,948 tCO2) closely matches the claimed figure (76,644 tCO2, 99.1%), but the project carries 17 corrective actions, missing key documents (PPA, no-double-counting declaration, technical specifications), and inconsistent leakage and safeguards reporting across documents, which collectively moderate confidence in the overall record.
Red Flags
- 17 corrective actions required in the 2020 verification report, including missing PPA, no-double-counting declaration, technical specifications, and local stakeholder consultation documents
- Leakage justification is inconsistent: the 2020 monitoring report states 'deemed negligible' while the 2020 verification report records it as 'not addressed'
- Baseline method is contradictory across documents: the 2012 verification report records 'project' while the 2020 monitoring report records 'jurisdictional'
- No buffer pool percentage stated and permanence/reversal risk explicitly not addressed in available documents
- FPIC not conducted and local stakeholder consultation documents listed as missing in corrective actions
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 18,377 | 18,377 | 0 | |
| 2007 | 19,917 | 19,917 | 0 | |
| 2008 | 18,727 | 18,727 | 0 | |
| 2009 | 19,877 | 19,877 | 0 | |
| 2010 | 16,585 | 16,585 | 0 | |
| 2011 | 15,106 | 15,106 | 0 | |
| 2012 | 18,524 | 18,524 | 0 | |
| 2013 | 19,306 | 19,306 | 0 | |
| 2014 | 17,864 | 17,864 | 0 | |
| 2015 | 16,895 | 16,895 | 0 | |
| 2016 | 2,216 | 2,216 | 0 | |
| Total | 183,394 | 183,394 | 0 |
Risk Indicators
Investment test, VVB-verified
reversal risk not addressed
0% deduction; justification inconsistent across docs
Grid EF standard; method label contradicts across docs
Grievance mechanism present; FPIC not conducted; stakeholder docs missing
CORSIA excluded; CCP status unknown; no-double-counting declaration missing
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.