8MW biomass based power plant at Phagwara
Score Breakdown
Integrity
verified The monitoring report (2022-08-19) reports no material findings and no reversal events, and the VVB verified the same total ER as claimed (227,187 tCO2e).
missing Leakage is not robustly treated in the extracted record (no quantified deduction and inconsistent justification across documents), and baseline reassessment timing is not stated.
Transparency
verified The VVB is identified (LGAI Technological Center, S.A. / Applus+), and claimed ER equals verified ER for the stated monitoring period (2012-12-01 to 2018-09-30).
missing The monitoring report (2022-08-19) required many corrective actions and missing evidence (e.g., calibration certificates, monitoring equipment details), reducing MRV transparency.
Claim Safety
verified ERs were verified by the VVB with no discrepancy between claimed and verified totals in the monitoring report (2022-08-19).
missing CORSIA eligibility and CCP status are not stated in the extracted record, and leakage handling is inconsistent, elevating greenwashing/over-crediting risk.
Documentation
verified Multiple document types are present in the extracted record (validation report, monitoring report, issuance), with high extraction confidence.
missing The monitoring report (2022-08-19) lists extensive corrective actions requesting core evidence (commissioning certificates, technical specs, calibration records), indicating incomplete documentation at assessment time.
Detailed Analysis
Integrity
Additionality is stated as confirmed by the VVB in the extracted record, supporting a baseline integrity check, but the specific additionality test type is not stated. The baseline is project-specific (AMS I.C v13), and the timing of any baseline reassessment is not stated in available documents. Leakage is a key weakness: no leakage deduction is provided and the monitoring report (2022-08-19) indicates leakage was not addressed, which is problematic for biomass projects where feedstock sourcing can create displacement effects. Permanence risk is low for an energy project and the monitoring report (2022-08-19) reports no reversals.
Transparency
The monitoring period is clearly stated (2012-12-01 to 2018-09-30) and the monitoring report (2022-08-19) shows the same total emission reductions claimed and verified (227,187 tCO2e). The VVB is clearly identified as Applus+ (LGAI Technological Center, S.A.). However, the monitoring report (2022-08-19) includes numerous corrective actions about missing evidence and non-conformance with the VCS monitoring report template, which reduces confidence in the transparency and quality of MRV disclosures.
Claim Safety
Over-crediting risk is moderated by the fact that claimed and verified ER totals match in the monitoring report (2022-08-19), but weakened by inconsistent leakage treatment and lack of a quantified leakage deduction. CORSIA eligibility and CCP status are not stated in the extracted record, so buyers cannot easily assess alignment with higher-integrity claim frameworks. The project uses a project-specific baseline approach (AMS I.C), and the grid emission factor year is not stated, which adds uncertainty around baseline parameter currency.
Documentation
The extracted record includes several document types (validation report, monitoring report, issuance) and the minimum extraction confidence is high, supporting basic completeness. Nonetheless, the monitoring report (2022-08-19) lists extensive corrective actions requesting fundamental supporting documents (commissioning certificates, technical specifications, calibration certificates, monitoring equipment details, stakeholder consultation/grievance records). This indicates that, at least at the time of assessment, documentation and evidence packages were incomplete or not well organized.
Overall
Overall quality is mid-range: VVB verification and matching claimed/verified ERs support credibility, but MRV and evidence gaps materially weaken confidence. The key contradiction is on leakage justification: the monitoring report (2022-08-19) says leakage was not addressed, while the validation report (2023-01-13) deems leakage negligible. I privilege the monitoring report statement because it is closer to the actual monitored period evidence and indicates what was (or was not) implemented/assessed in monitoring, whereas the validation position is ex-ante and less specific to monitored practice; this contradiction lowers integrity and claim-safety scores due to data reliability concerns. Note: if documentation were scored below 3.0, transparency would be capped post-scoring, but that gate is not triggered here.
Audit Analysis
The project has VVB-verified emission reductions (227,187 tCO2e) and no reported material findings or reversals, which supports basic credibility. However, key integrity elements are weakly evidenced in the extracted record—especially leakage treatment and baseline reassessment—while the monitoring report triggered numerous corrective actions, indicating MRV and reporting quality issues.
Project Description
Proponent: JCT Ltd Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.C. Estimated annual GHG reductions: 29393 tCO2e Region: Asia Registration date: 2020-04-06
Red Flags
- Leakage treatment is inconsistent across documents (not addressed vs deemed negligible), increasing over-crediting risk for a biomass supply chain project.
- Extensive corrective actions in the monitoring report (templates, missing commissioning/technical specs, calibration evidence, monitoring equipment details) indicate MRV/documentation weaknesses.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 3,639 | 3,639 | 0 | |
| 2013 | 39,736 | 39,736 | 0 | |
| 2014 | 41,951 | 41,951 | 0 | |
| 2015 | 29,147 | 29,147 | 0 | |
| 2016 | 40,147 | 37,897 | 2,250 | |
| 2017 | 38,271 | 26,366 | 11,905 | |
| 2018 | 34,296 | 31,965 | 2,331 | |
| Total | 227,187 | 210,701 | 16,486 |
Cosa migliorerebbe questo punteggio
- Provide a quantified leakage assessment (or a documented, evidence-based justification for negligible leakage) tied to biomass feedstock sourcing and any displacement effects, consistently across validation and monitoring.
- Close the monitoring report corrective actions with publicly available supporting evidence (commissioning certificates, technical specs, calibration certificates, monitoring equipment details, stakeholder consultation and grievance records) and update the MR to the correct VCS template.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality (test type not specified)
Energy project with no reversals reported
Leakage not quantified and justification inconsistent
Project-specific baseline; reassessment timing not stated
Safeguards and grievance mentioned; FPIC/benefit sharing not
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →