A-Gas 2019-5
#118of 345 in United States#48of 147 in American Carbon Registry (ACR)
Audit Analysis
The Rock Wall ODS project (ACR-473) in Ohio received VVB verification from Dillon Consulting Limited with a verified ERR of 125,403 against a claimed 126,403 — a 99.2% match indicating minimal over-crediting. However, the extracted record lacks documented additionality testing, baseline methodology, and leakage treatment, creating meaningful evidence gaps despite the absence of material findings or corrective actions.
Red Flags
- Additionality test type and VVB confirmation of additionality are not stated in the extracted verification report, leaving the regulatory/investment basis for the project undocumented in the available record
- Baseline methodology and last reassessment date are not found in the extracted data, making it impossible to confirm the counterfactual (i.e., that the ODS would have been vented without the project)
- Leakage deduction and justification are absent from the extracted record; for an ODS destruction project this should at minimum confirm that no ODS escaped the destruction process
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 125,403 | 0 | 0 | |
| Total | 125,403 | 0 | 0 |
Risk Indicators
Test not documented in extracted record
ODS destruction — no carbon-stock reversal risk
Deduction and justification not stated
Methodology not found in extracted data
Not documented in available record
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →