A-Gas V8 in Texas
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB (validation/verification documentation).
missing Leakage is not clearly quantified or justified in the monitoring/verification record, despite being discussed differently in the PDD.
Transparency
verified Independent VVB is identified (First Environment, Inc.) and the monitoring period is clearly stated (2021-01-06 to 2021-12-31).
missing Key quantified outcomes (claimed and verified emissions reductions) were not found in the extracted record.
Claim Safety
verified Not CORSIA-eligible, reducing dual-claiming/aviation-eligibility marketing risk.
missing Over-crediting risk is harder to rule out because leakage handling is unclear and ERR totals were not found in the extracted record.
Documentation
verified Multiple core documents are available (PDD, validation report, monitoring report) with high extraction confidence.
missing Some critical elements are missing or inconsistent across documents (leakage and safeguards), reducing reliability.
Detailed Analysis
Integrity
The validation/verification documentation indicates additionality was assessed using a combined test and confirmed by the VVB (validation/verification report set). The project uses a project-specific baseline approach under the ACR reclaimed HFC refrigerants methodology (PDD). No reversals are reported, which is consistent with an avoidance project type (monitoring/verification record). Integrity is weakened by unclear leakage treatment: the monitoring/verification record indicates leakage was not addressed, and no leakage deduction is evidenced in the extracted record (monitoring/verification record).
Transparency
The monitoring period (2021-01-06 to 2021-12-31) and the VVB (First Environment, Inc.) are clearly identified (monitoring/verification record). However, the extracted record does not include the total emissions reductions claimed or verified, limiting the ability to independently reconcile issuance quantities (monitoring/verification record). The baseline is described only at a project-specific level, and the timing of any baseline reassessment is not stated in the extracted record (PDD/monitoring record).
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces the risk of aviation-related eligibility claims (registry/eligibility record). CCP status is not stated in the extracted record, leaving uncertainty for high-integrity buyer claims. Claim safety is also constrained by potential over-crediting uncertainty because leakage is not clearly addressed in the monitoring/verification record and the extracted record lacks the headline claimed/verified ERR totals needed for external consistency checks (monitoring/verification record).
Documentation
Three key documents were used (PDD, validation report, monitoring report) and extraction confidence is high, supporting a moderate-to-strong documentation score (document set). No material findings or corrective actions are reported in the extracted record, which suggests a clean assurance outcome (verification report). Nonetheless, documentation quality is reduced by internal inconsistencies on leakage and safeguards between the PDD and later monitoring/verification materials, indicating gaps in how key topics were carried through to MRV (PDD vs monitoring/verification record).
Overall
Overall quality is moderate: additionality is VVB-confirmed and reversals are not reported, but important risk controls are not consistently evidenced. Contradiction 1 (leakage): the PDD states leakage was deemed negligible (PDD, 2022-09-19), while the later monitoring/verification record indicates leakage was not addressed (monitoring/verification record, 2022-10-14); the later monitoring/verification record is privileged because it reflects what was actually monitored and assured for issuance, and this inconsistency lowers integrity and claim-safety. Contradiction 2 (safeguards): the PDD indicates safeguards were mentioned (PDD, 2022-09-19) but the later monitoring/verification record indicates safeguards were not mentioned (monitoring/verification record, 2022-10-14); the later record is privileged for the same reason, and the inconsistency increases reputational/ESG risk and reduces transparency.
Audit Analysis
This is an HFC refrigerant reclamation avoidance project under ACR with additionality confirmed by the VVB and no reversals reported. However, leakage treatment and safeguards are inconsistently documented between the PDD and later monitoring/verification materials, creating some over-crediting and reputational risk.
Project Description
The A-Gas US, Inc. voluntary emission reduction project, A-Gas V8, was undertaken to encourage the recovery of used HFCs (hydrofluorocarbons) and to avoid production of virgin HFCs through the reclamation of HFCs. The project HFCs were U.S. domestically sourced and were reclaimed from HVAC (heating, ventilaton and air conditioning) systems. The HFC was reclaimed to industry specification standards at A-Gas facilities with the intention to resell into the market. All applicable laws and regulations were followed throughout this project.
Red Flags
- Leakage is treated inconsistently: the PDD deems it negligible, while the monitoring/verification record indicates leakage was not addressed.
- Safeguards are inconsistent: the PDD mentions safeguards, but the monitoring/verification record indicates safeguards were not mentioned; no FPIC or grievance mechanism is documented.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1,368,452 | 0 | 1,368,452 | |
| Total | 1,368,452 | 0 | 1,368,452 |
Cosa migliorerebbe questo punteggio
- Provide explicit leakage assessment in the monitoring/verification package (quantify and/or justify negligible leakage and state any deduction applied).
- Publish a clear safeguards package (stakeholder engagement summary, grievance mechanism, and any applicable social/environmental risk management) and ensure it is carried through into monitoring/verification reporting.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined additionality test
Avoidance project; no reversals reported
Leakage not clearly treated in monitoring/verification record
Project-specific baseline; reassessment timing not evidenced
Safeguards/FPIC/grievance not evidenced consistently
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →