Acapa - Bajo Mira Y Frontera REDD+ Project
#51of 261 in Soil carbon#36of 124 in Colombia#508of 1339 in Verra (VCS)#3of 10 in VM0006
Audit Analysis
The Acapa-Bajo Mira REDD+ project in Colombia is a VCS-registered avoided-deforestation project with VVB-confirmed additionality, a 10% buffer pool, and no reported reversal events. However, the project-specific baseline, a 67% pro-rata delivery rate for the 2019 monitoring period, 41 nonconformity reports, and 18 open corrective actions raise meaningful concerns about data reliability and long-term claim robustness. The record is moderately transparent but contains several unresolved contradictions and gaps in key parameters.
Red Flags
- The 2019 monitoring period delivered only ~67% of the pro-rata ex-ante expectation (270,392 vs ~404,786 tCO2e), suggesting potential over-crediting in the lifetime estimate or under-delivery in the field.
- 41 nonconformity reports (32 VCS + 9 CCB) and 18 corrective actions were raised in the 2024 verification, including transcription errors in multiple tables and mismatched leakage values between tables 17 and 18.
- The ex-ante lifetime ERR figure is internally contradictory within the same validation report (12,143,586 vs 10,535,712 tCO2e), undermining confidence in the baseline estimate.
- A methodology deviation was approved to use the VT0005 remote-sensing tool for biomass measurement instead of ground plots, introducing additional uncertainty into carbon stock estimates.
- The baseline is project-specific rather than jurisdictional, and the last baseline reassessment date is not stated in any available document despite the 10-year reassessment interval having passed (project start 2013).
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 21,601 | 19,587 | 2,014 | |
| 2014 | 41,615 | 38,609 | 3,006 | |
| 2015 | 107,277 | 107,277 | 0 | |
| 2016 | 154,502 | 153,985 | 517 | |
| 2017 | 165,543 | 165,543 | 0 | |
| 2018 | 167,653 | 167,653 | 0 | |
| 2019 | 236,436 | 174,356 | 62,080 | |
| Total | 894,627 | 827,010 | 67,617 |
Risk Indicators
VVB-confirmed combined test
10% buffer, no reversals
Quantified but PDD gap
Project-specific, reassessment unclear
FPIC, grievance, benefits
CCP/CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.