Skip to main content
ACRIndustrial Process EmissionsMISSOURI, USGeneral Methodologyv2.1

Advanced Refrigeration and HFC Draw Down � Project 007A � CA (& 11 states)

ACR-927 ↗

#77of 108 in Water#216of 345 in United States#99of 147 in American Carbon Registry (ACR)

4.7/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.5

Audit Analysis

This ACR-registered HFC drawdown project in Missouri (and 11 other US states) has VVB-confirmed additionality and a reasonable leakage justification, but is undermined by four material findings—including calculation errors and incorrect GWP values—plus a serious internal contradiction in the validation report showing two different ERR figures (71,852 vs. 317,089) in the same document. The absence of a stated baseline method, FNRB data, and usage-monitoring details further weakens the evidentiary base.

Red Flags

  • The validation report (2024-10-01) contains two conflicting ERR values—71,852 and 317,089—for both claimed and verified figures within the same document, creating an unresolved data-integrity question.
  • Four material findings were reported, including incorrect annual amortized emission-rate calculations and wrong GWP values for post-June 2021 projects, all requiring corrective action.
  • Baseline method and baseline reassessment date are not stated in any available document, leaving the baseline construction unverifiable.
  • FNRB method and value are not stated, and no usage-monitoring method is described, limiting the ability to independently verify emission-reduction claims.

Credit Vintages

IssuedRetiredAvailable
2022
71,852071,852
Total71,852071,852

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Industrial HFC drawdown; no reversal risk

Leakage

Deemed negligible; consistent with HFC destruction

Baseline

Method and reassessment date not stated

Safeguards

Mentioned but FPIC not conducted; grievance mechanism absent

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents