Advanced Refrigeration - ARS2021004
#61of 108 in Water#180of 345 in United States#80of 147 in American Carbon Registry (ACR)
Audit Analysis
This ACR-registered advanced refrigeration project in the southeastern US has VVB-confirmed additionality via a combined test, but is undermined by ten material findings (including incorrect GPS coordinates and a monitoring report that omitted total emission reductions), three required corrective actions, and contradictions between the validation and monitoring reports on leakage and reversal treatment. The identical claimed, verified, and ex-ante lifetime ERR figures (164,129 tCO₂e) across a single-year crediting period raise questions about the independence of the verification, and the 0% leakage deduction rests on a thin 'deemed negligible' justification that the validation report does not even address.
Red Flags
- Ten material findings in the verification report, including incorrect GPS coordinates for three stores, a monitoring report that failed to include total emission reductions, and placeholder text for the number of site visits in both the Project Plan and Monitoring Report
- All three ERR figures (claimed, verified, ex-ante lifetime) are identical at 164,129 tCO₂e, suggesting the verifier may have simply confirmed the ex-ante estimate rather than independently quantifying reductions
- Contradiction between the validation report (leakage 'not addressed') and the monitoring report (leakage 'deemed negligible') on the same date (2023-10-06), indicating inconsistent treatment of a key quantification parameter
- Three corrective actions were required (revise Project Plan, revise Monitoring Report, correct GPS coordinates), meaning the documents were not in a fully compliant state at the time of verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 164,129 | 163,709 | 420 | |
| Total | 164,129 | 163,709 | 420 |
Risk Indicators
VVB-confirmed combined test
Technology-based, no carbon-stock reversal risk
0% deduction, thin justification, doc contradiction
Project-specific, no reassessment date stated
Mentioned but FPIC not conducted, no grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →