Skip to main content
ACRIndustrial Process EmissionsMISSOURI, USGeneral Methodologyv2.1

Advanced Refrigeration - ARS2022004

ACR-1008 ↗

#86of 110 in Water#288of 389 in United States#152of 195 in American Carbon Registry (ACR)

4.2/ 10
Integrity
4.0
Transparency
5.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This ACR Advanced Refrigeration project in Missouri has a VVB-confirmed additionality assessment but is undermined by ten material findings, eight required corrective actions, and a direct contradiction between the project's leakage justification and the VVB's assessment. The identical ERR figures across claimed, verified, and ex-ante lifetime measures, combined with calculation errors flagged by the VVB, raise meaningful over-crediting concerns. Documentation is present but riddled with errors across the ESIA, Project Plan, and Monitoring Report.

Red Flags

  • Ten material findings reported by the VVB, including incorrect GWP values, inconsistent leakage amounts, and emission reductions not rounded down to the nearest whole number in the calculation spreadsheet
  • The VVB's validation report states leakage was 'not addressed,' directly contradicting the monitoring report's claim that leakage was 'deemed negligible' — the VVB's assessment is the authoritative one
  • Total ERR claimed, verified, and ex-ante lifetime are all identical at 26,766, and the VVB flagged that the figure was not properly rounded down, suggesting the reported number may be slightly inflated
  • Missing documentation for the handling and destruction of recovered baseline refrigerant, a key operational safeguard for a refrigeration project

Credit Vintages

IssuedRetiredAvailable
2022
26,766026,766
Total26,766026,766

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Technology-based, no reversal risk

Leakage

VVB says not addressed; project claims negligible

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC not conducted, no grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents