Advanced Refrigeration - ARS2024003
#55of 108 in Water#168of 345 in United States#74of 147 in American Carbon Registry (ACR)
Audit Analysis
This ACR Advanced Refrigeration project (ARS v3.0) in the US Midwest has VVB-confirmed additionality and all 24 material findings were corrected, but the monitoring period is listed with an end date before its start date, the baseline method is not stated in available documents, and the leakage justification is inconsistent between the validation and monitoring reports. The project structure is appropriate for a one-time refrigerant-switch credit, but documentation quality and MRV transparency remain below standard.
Red Flags
- Monitoring period is listed as 2024-07-25 to 2024-07-24 (end date precedes start date), making the actual reporting window unverifiable from the extracted record
- 24 material findings in the verification report, including equations inconsistent with ARS Methodology v3.0, a refrigerant charge-size mismatch at Giant Eagle Westfield, and a cooling-capacity error at Kwik Trip Hartland that appears replicated from another site
- Baseline method is not stated in any available document, and no baseline reassessment date is recorded
- Leakage justification is 'deemed negligible' in the monitoring report but 'not addressed' in the validation report, creating an inconsistency in the project's environmental claims
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 25,306 | 8,106 | 17,200 | |
| Total | 25,306 | 8,106 | 17,200 |
Risk Indicators
VVB-confirmed combined test
Technology-based; no carbon-stock reversal risk
Deemed negligible but inconsistent across documents
Method not stated; no reassessment date
Mentioned but FPIC not conducted; grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →