Skip to main content
CDMReforestationChinaAR-AM0003

Afforestation and Reforestation on Degraded Lands in Northwest Sichuan, China

CDM-2700 ↗

#4of 80 in ARR (afforestation)#312of 1084 in China#443of 1459 in CDM (UNFCCC)

5.5/ 10
Integrity
6.2
Transparency
4.8
Claim Safety
5.8
Documentation
4.5

Audit Analysis

A CDM reforestation project in Northwest Sichuan with VVB-verified additionality and quantified leakage, but significant evidence gaps including no monitoring data, no verified ERR figures, and low document extraction confidence. The project-specific baseline and absence of a buffer pool mechanism leave moderate permanence and over-crediting risk unaddressed in the available record.

Red Flags

  • No monitoring period or verified ERR figures found in any available document, making it impossible to confirm actual delivery against the 23,030 tCO2 lifetime claim
  • Low extraction confidence across the document set means key operational and MRV details may be missing from the record
  • Ongoing corrective action requires continued monitoring of contractual relations with land owners, indicating a residual additionality/permanence risk
  • No buffer pool or permanence mechanism stated for this reforestation project, leaving reversal risk (fire, disease, land-use change) unquantified
  • Buffer pool size not disclosed in available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; reversal risk unaddressed

Leakage

Quantified in PDD

Baseline

Project-specific; no reassessment date

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AR-AM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents