Air Bag Gas Substitution
#51of 345 in United States#20of 147 in American Carbon Registry (ACR)
Audit Analysis
Nike's airbag gas substitution project (replacing SF6/C3F8) is a well-verified industrial avoidance project with VVB-confirmed additionality and a clean leakage assessment. However, the documentation record is thin (only two documents), several MRV parameters are unstated, and a minor contradiction exists on the additionality test type between the methodology and the verification report.
Red Flags
- Additionality test type is inconsistent between documents: the methodology describes a 'regulatory' test while the verification report (2006-07-31) records a 'barrier' test — the VVB's independent finding is privileged, but the discrepancy weakens the audit trail.
- Only two source documents (verification report and methodology) are available; no separate PDD, monitoring report, or project design document was found in the extracted record, limiting the ability to cross-check baseline assumptions and MRV protocols.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2003 | 1,898,382 | 7,666 | 1,890,716 | |
| 2004 | 3,004,613 | 0 | 3,004,613 | |
| 2005 | 3,081,011 | 10,000 | 3,071,011 | |
| Total | 7,984,006 | 17,666 | 7,966,340 |
Risk Indicators
VVB-confirmed barrier test
One-time gas substitution, verified complete
Deemed negligible, VVB-confirmed
Project-specific, no reassessment date
Not documented in available records
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →