Skip to main content
VCSAgriculture Forestry and Other Land UsePeru Registry: RegisteredGeneral Methodologyv2.1

Alto Huayabamba: Carbon Dioxide sequestration through reforestation with small-scale farmers in Peru, San Martin Region

VCS-796 ↗

#161of 261 in Soil carbon#18of 24 in Peru#1052of 1339 in Verra (VCS)

4.3/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This VCS reforestation project in Peru has VVB-confirmed additionality and documented safeguards, but is undermined by a significant reversal event (25,147 tCO2e loss), a questionable zero-leakage claim, extensive data-quality issues flagged by the VVB, and verified removals that represent only about 17–20% of the pro-rata expectation for the elapsed monitoring period. Six contradictions across documents, 19 corrective action requests, and a 15.6% project-area reduction further erode confidence in the integrity and accuracy of the credit claims.

Red Flags

  • Reversal event of 25,147 tCO2e (8% of previously verified removals) reported during the 2019–2023 monitoring period, deducted from gross removals
  • Zero leakage deduction justified as 'deemed negligible' in the 2025 verification report, yet the 2019 appendix described leakage as 'quantified' — the VVB issued a CAR demanding scientific evidence for the zero-leakage claim
  • Verified removals of 23,164 tCO2e represent only ~17% of the linear pro-rata expectation (~135,500 tCO2e) for the 4.7-year monitoring period out of the 40-year crediting period, even before accounting for the non-linear growth curve of reforestation
  • Project area reduced from 1,613 ha to 1,361 ha (15.6% loss) due to data-quality issues, with inconsistencies in GIS tracks, parcel coding, and overlapping areas flagged
  • 19 corrective action requests, 14 non-material findings, 5 additional documentation requests, and 7 clarification requests issued by the VVB, indicating systemic documentation and calculation weaknesses

Credit Vintages

IssuedRetiredAvailable
2008
48,87048,8700
2014
218,138212,3445,794
2019
3,64703,647
2020
3,62803,628
2021
3,62803,628
2022
3,62803,628
2023
5,15705,157
Total286,696261,21425,482

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer pool present but reversal event reported

Leakage

Zero deduction, justification inconsistent across docs

Baseline

Project-specific baseline, reassessment date not stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated; overlap with other AFOLU projects flagged

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents