Skip to main content
ACRIndustrial Process EmissionsFLORIDA, USGeneral Methodologyv2.1

American Refrigerants HFC Reclamation Project - 2023

ACR-1050 ↗

#170of 345 in United States#76of 147 in American Carbon Registry (ACR)

5.0/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The HFC reclamation project has a verified additionality assessment and a reputable VVB (SCS Global Services), but the monitoring report surfaced ten non-conformities including missing EPA technician certifications, absent reclamation reports, and a misclassification of emission reductions. The 0% leakage deduction rests on a thin 'deemed negligible' justification, and the project-specific baseline lacks a documented reassessment date, leaving moderate uncertainty around the robustness of the credit claims.

Red Flags

  • Ten non-conformities in the monitoring report, including missing EPA certification cards for all refrigerant-handling technicians and missing reclamation reports for the entire monitoring period, undermining the MRV chain
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis or supporting data in the extracted record
  • Misclassification of emission reductions as ex-ante in the GHG Project Plan (NCR 6), indicating a conceptual error in the project documentation
  • Crediting period dates differ between the monitoring report (2023-01-09 to 2038-01-08) and an earlier document (2023-09-01 to 2038-08-01), suggesting administrative inconsistency

Credit Vintages

IssuedRetiredAvailable
2023
42,234042,234
2024
4520452
Total42,686042,686

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Technology-based, no reversal risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but incomplete (no FPIC, no grievance mechanism stated)

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents