Audit Analysis
The Burnt Mountain Forestry Project has a verified additionality test and a 40% quantified leakage deduction, but the verification report (September 2024) identified 17 material findings including multiple non-conformities, a draft (unsigned) monitoring report, and a buffer pool applied at 16% instead of the required 18%. These data-quality and compliance issues, combined with a project-specific baseline and unresolved contradictions in leakage figures, significantly undermine confidence in the integrity and accuracy of the claimed credits.
Red Flags
- The monitoring report submitted for verification was a draft and had not been signed (OBS 4, verification report 2024-09-10), meaning the underlying data had not been formally approved by the project operator.
- Buffer pool contribution was applied at 16% instead of the 18% required by the methodology (NCR 9), meaning credits were issued with an insufficient reversal-risk buffer.
- A 100-fold discrepancy in the leakage deduction (40% in the June 2024 monitoring report vs. 0.4% in an undated document) raises serious questions about which figure was actually used in credit calculations.
- Multiple calculation errors were identified, including incorrect uncertainty values (NCR 7), wrong cell references for future-year GHG reductions (NCR 11), and inconsistent carbon values between the GHG Plan, Monitoring Report, and workbooks (NCR 16).
- Free, Prior, and Informed Consent (FPIC) was not conducted, and no grievance mechanism or benefit-sharing arrangement is documented, despite the project being on private forestland in Vermont.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 16,782 | 16,782 | 0 | |
| 2019 | 49,796 | 42,718 | 7,078 | |
| 2020 | 49,794 | 44,874 | 4,920 | |
| 2021 | 48,521 | 9,768 | 38,753 | |
| 2022 | 40,563 | 4,952 | 35,611 | |
| 2023 | 18,759 | 4,426 | 14,333 | |
| Total | 224,215 | 123,520 | 100,695 |
Risk Indicators
VVB-confirmed combined test
Buffer pool present but misapplied (16% vs 18%)
40% deduction stated but contradicted by 0.4% in another doc
Project-specific baseline; no reassessment date stated
Safeguards mentioned; FPIC not conducted; no grievance mechanism
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →