Anhui Huainan Chemical N2O Abatement Project at Nitric Acid Plant Line4
#4of 189 in Methane#31of 1084 in China#74of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM N2O abatement project at a nitric acid plant with a VVB-confirmed combined additionality test and a measured project-specific baseline. The project significantly over-delivered relative to its pro-rata expectation (approximately 4.5×), indicating conservative crediting. Key gaps include the absence of a stated permanence mechanism, a contradictory leakage justification across monitoring reports, and missing CORSIA/CCP eligibility information.
Red Flags
- Leakage justification is contradictory: the 2011 monitoring report states leakage was 'not addressed' while the 2012 report states it was 'deemed negligible' with a 0% deduction — the earlier gap raises questions about whether leakage was ever properly assessed
- Total ERR claimed differs between the two monitoring reports (78,997 in 2011 vs 149,352 in 2012), a near-doubling that is not explained in the extracted record
- Crediting period dates conflict between the validation report (2009-04-06 to 2016-04-05) and the 2012 monitoring report (2010-03-16 to 2017-03-15), creating ambiguity about the actual approved period
- No buffer pool, permanence mechanism, or reversal-risk mitigation is documented for a project whose abatement depends on continuous catalyst operation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 250,949 | 0 | 250,949 | |
| Total | 250,949 | 0 | 250,949 |
Risk Indicators
Combined test, VVB-confirmed
cessation risk unaddressed
0% deduction, contradictory justification
Project-specific measured, no reassessment stated
Mentioned but FPIC and grievance absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →