Skip to main content
CDMLandfill gasThailandACM0001

Bangkok Kamphaeng Saen East: Landfill Gas to Electricity Project

CDM-3462 ↗

#104of 189 in Methane#30of 48 in Thailand#1055of 1459 in CDM (UNFCCC)#95of 159 in ACM0001

4.6/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A CDM landfill gas-to-electricity project in Thailand with VVB-confirmed additionality (barrier test) but significant documentation quality issues, including 11 material findings and 11 corrective actions identified in the monitoring report. The project-specific modeled baseline and 0% leakage deduction are defensible for this project type, but contradictions in ERR figures and crediting period across documents reduce confidence in the data record.

Red Flags

  • 11 material findings in the monitoring report, including an incorrect ex-ante OM calculation method (simple average instead of generation-weighted average) and an inconsistent model correction factor (0.9 stated vs 0.75 applied)
  • Crediting period contradiction: one document states 2011–2032 while the more recent monitoring report states 2018-01-21 to 2025-01-20, creating uncertainty about the actual registration window
  • Leakage justification contradicts itself across two monitoring reports (quantified in 2019 vs not addressed in 2018)

Credit Vintages

IssuedRetiredAvailable
2012
208,8740208,874
2013
133,6950133,695
2014
563,5110563,511
2015
442,4330442,433
2016
398,7350398,735
2017
302,0470302,047
2018
294,1690294,169
2019
85,950085,950
2020
101,7430101,743
Total2,531,15702,531,157

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

biological source

Leakage

0% deduction, quantified but contradictory across reports

Baseline

Project-specific modeled baseline, reassessed 2018

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CDM project; CORSIA and CCP status not explicitly stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents