Score Breakdown
Integrity
verified Additionality was confirmed by TÜV NORD CERT GmbH, and the verification record indicates a combined additionality test rather than a purely qualitative claim.
missing The latest verification report records numerous corrective action requests and clarifications, and leakage justification is marked as not addressed.
Transparency
verified The project has a named VVB, a defined monitoring period, and both claimed and verified emission reductions are available in the verification record.
missing Several important monitoring details are not stated in available documents, including the usage monitoring method and the verified usage rate.
Claim Safety
verified The project uses ACM0001 for landfill gas to electricity, which is a recognized methodology for this sector.
missing The latest verification report shows a 0% leakage deduction without a supporting justification, and the claimed versus verified ER figures differ slightly.
Documentation
verified The record includes multiple official document types, with 21 extracted facts and a medium extraction confidence level.
missing The latest verification report contains many corrective actions, and some key fields are missing or only partially specified in the extracted record.
Detailed Analysis
Integrity
The verification report confirms additionality through a combined test and names TÜV NORD CERT GmbH as the VVB, which supports the core project case. At the same time, the latest verification record lists many corrective action requests and clarifications, and the leakage justification is not addressed even though a 0% deduction is shown. Reversal risk is also not cleanly resolved because the record says special events occurred during the monitoring period, while reversal events are otherwise not addressed in the extracted facts.
Transparency
Transparency is moderate because the project has a named verifier, a defined monitoring period, and both claimed and verified emission reductions are available. However, the usage monitoring method and verified usage rate are not stated in available documents, which limits MRV clarity. The record also shows a small gap between claimed and verified reductions, which is not large but still reduces confidence in reporting precision.
Claim Safety
Claim safety is weakened by the latest verification report’s 0% leakage deduction paired with a leakage justification marked as not addressed. The project uses ACM0001, which is appropriate for landfill gas to electricity, but the absence of a clear leakage explanation and the small discrepancy between claimed and verified ER figures increase over-crediting concern. CORSIA eligibility is marked true, while CCP status is not stated, so dual-channel risk is not fully resolved.
Documentation
Documentation is fair but not strong: the record draws from multiple official documents and includes a named verifier, monitoring period, and crediting period. Still, the latest verification report contains many corrective actions and the extraction confidence is only medium, indicating some readability or completeness limitations. The crediting period and monitoring period are also not perfectly aligned across documents, which adds to the documentation uncertainty.
Overall
I privileged the most recent verification report when documents conflicted, because it is the latest and most project-specific source for the monitored period; that means I used the combined additionality test, the 0% leakage deduction with no justification, and the later verified emissions figure. I also noted the contradiction where earlier documents reported reversal events while the later verification record says reversal events are not addressed, which lowers reliability. Another contradiction is the change in credited emissions and baseline-related values across reports; the later verification figures were favored, but the inconsistency still reduces confidence and pulls scores down.
Audit Analysis
This landfill gas project has some strengths, including VVB-confirmed additionality, FPIC, grievance mechanisms, and a named verifier. However, the record also shows many corrective actions and clarification requests, missing leakage justification in the latest verification record, and several key values that are either not stated or inconsistent across documents. Overall, the project looks usable but not especially robust from a credit-quality perspective.
Project Description
Developer: Sindicatum Carbon Capital International Limited Type: Other Size: Large scale Methodology: ACM0001 Flaring or use of landfill gas Crediting period: 2012-04-01 → 2019-03-31 Estimated annual credits: 100500 tCO2e SDGs: Goal 3: Good Health and Well-Being, Goal 13: Climate Action, Goal 12: Responsible Production and Consumption
Red Flags
- The latest verification record lists many corrective actions and clarifications, suggesting material documentation and monitoring weaknesses.
- Leakage is shown as a 0% deduction, but the latest verification report says the justification was not addressed.
- Several core figures conflict across documents, including credited emissions, baseline-related values, and the treatment of reversal events.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 246,904 | 0 | 246,904 | |
| 2013 | 350,762 | 0 | 350,762 | |
| 2014 | 305,420 | 0 | 305,420 | |
| Total | 903,086 | 0 | 903,086 |
Cosa migliorerebbe questo punteggio
- Publish a clear leakage assessment and justification for the 0% deduction, with supporting calculations in the monitoring report.
- Resolve the monitoring and verification inconsistencies by reconciling reversal-event treatment, credited emissions, and all corrective actions in a single updated disclosure.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed test
reversal risk not clearly resolved
0% deduction without clear justification
project baseline, reassessment not stated
FPIC and grievance mechanism present
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- (2)Monitoring Report_5th monitoring period_01.10.2013 to 31.10.2014_v4.pdf
- (1)Monitoring Report_1st monitoring period_21.01.2011 to 31.05.2011_v1.pdf
- Monitoring Report_7th monitoring period_01.11.2015 to 31.10.2016_v1.pdf
- Monitoring Report_4th monitoring period_01.04.2012 to 30.09.2013_v1.pdf
- Monitoring Report_8th monitoring period_01.11.2016 to 20.01.2018_v1.pdf
- (1)Monitoring Report_2nd monitoring period_01.06.2011 to 31.10.2011_v1.pdf
- +3 more
registry_page
validation
- Verification Report_7th monitoring period_01.11.2015 to 31.10.2016_v1.pdf
- Verification Report_8th monitoring period_01.11.2016 to 20.01.2018_v1.1.pdf
- (1)Verification Report_3rd monitoring period_01.11.2011 to 31.03.2012_v7.pdf
- (1)Verification Report_1st monitoring period_21.01.2011 to 31.05.2011_v5.pdf
- (1)Verification Report_2nd monitoring period_01.06.2011 to 31.10.2011_v2.pdf
- GS1371 Validation Report_18.01.2011_v3.pdf
- +3 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →