Believe Green Safe Drinking Water – Spring Health-2
GS-1893 ↗ · current registry ID: GS7496
#345of 1329 in Industrial#465of 975 in India#557of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard safe-drinking-water project in India that displaces decentralized thermal energy for water heating. Additionality was confirmed by the VVB via a combined test, and the verification report (August 2023) closed all eleven material findings without requiring corrective actions. However, the project relies on a project-specific baseline, assumes 100% usage where the original PDD assumed 82%, applies a 0% leakage deduction, and provides no buffer pool or permanence mechanism, leaving meaningful over-crediting and permanence risk.
Red Flags
- Usage rate assumed at 100% in the monitoring report versus 82% in the original PDD, inflating claimed credits by roughly 22% without independent measurement
- No buffer pool or permanence mechanism stated in any available document, and reversal events are explicitly 'not addressed'
- Leakage deduction of 0% with a 'quantified' justification is internally inconsistent — if leakage was quantified, the result and method should be documented
- Crediting period end date is missing in the verification report (start 2019-01-26, end not stated), while the PDD lists 2018-08-01 to 2033-08-01, creating uncertainty about the actual crediting window
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 7,500 | 7,500 | 0 | |
| 2020 | 9,777 | 9,777 | 0 | |
| 2021 | 1,551 | 1,551 | 0 | |
| Total | 18,828 | 18,828 | 0 |
Risk Indicators
VVB-confirmed combined test
reversals not addressed
0% deduction, 'quantified' label only
Project-specific; reassessment date not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →