Bharat Petroleum Corporation Limited (BPCL)s Wind Power Project, India
#1218of 1935 in Renewable energy#642of 975 in India#936of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM wind power project with VVB-verified additionality and inherently low permanence risk, but undermined by a significant discrepancy between the ex-ante and monitoring-period emission reduction figures (roughly 7.7× the pro-rata expectation) and a contradictory baseline method description across documents. Several material findings and corrective actions were flagged during validation, and key transparency data points (FNRB, usage monitoring, CORSIA status) are absent from the extracted record.
Red Flags
- Emission reduction figure in the monitoring report (5,654 tCO₂ for ~9 months) is approximately 7.7× the pro-rata expectation derived from the validation report's 10-year ex-ante estimate of 9,769 tCO₂, raising over-crediting concerns
- Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the validation report — a fundamental methodological inconsistency
- Three corrective actions were required at validation, including revision of the monitoring plan and a delay to the crediting-period start date
- Net electricity exported to the grid was calculated rather than measured, contrary to the registered PDD, as noted in the validation report's material findings
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 5,615 | 0 | 5,615 | |
| Total | 5,615 | 0 | 5,615 |
Risk Indicators
Combined test, VVB-verified by DNV
Wind displacement – no biogenic reversal risk
0% deduction, reasonable for grid-connected wind
Method contradicts across documents (project vs jurisdiction
Safeguards mentioned but FPIC and grievance mechanism not de
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →