Biochar Project-1 by WeAct
#30of 61 in Biochar#761of 975 in India#987of 1339 in Verra (VCS)#2of 5 in VM0044
Audit Analysis
This VCS biochar project in India has a VVB-confirmed additionality assessment and matching claimed/verified ERR figures for the 2023–2025 monitoring period, but is undermined by a 4.7× discrepancy in the ex-ante lifetime ERR between the verification report and monitoring report, a 0% leakage deduction with contradictory justifications, and an extensive list of 23 corrective action requests that signal weak initial documentation. The 100-year permanence claim lacks a stated buffer pool, and key MRV parameters (FNRB method, usage monitoring) are absent from the record.
Red Flags
- Ex-ante lifetime ERR differs by a factor of ~4.7 between the verification report (44,589 tCO₂e) and the monitoring report (208,082 tCO₂e), raising serious data-reliability concerns
- 23 corrective action requests and 4 clarification requests were raised during verification, indicating substantial initial non-compliance with VCS MR Template v4.4
- Leakage justification is contradictory: the verification report states 'deemed negligible' while the monitoring report states 'quantified', yet the deduction is 0% in both
- 100-year permanence claim with no buffer pool percentage stated in any available document
- End-use tracking is described as 'documented' in the verification report but 'not addressed' in the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 10 | 0 | 10 | |
| Total | 10 | 0 | 10 |
Risk Indicators
VVB-confirmed combined test
100-yr claim, no buffer pool stated
0% deduction, contradictory justification
Project-specific, ex-ante ERR contradicts
FPIC and grievance present but inconsistently documented
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →