Biochar Project-1 by WeAct
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, which is a meaningful positive signal for project integrity.
missing The record does not state the additionality test type, buffer pool contribution, leakage deduction, or any reversal treatment, leaving several core integrity checks incomplete.
Transparency
verified The monitoring report is identified, dated 2023-07-05, and the project has a named VVB, which supports some traceability.
missing Claimed and verified emission reduction totals are not found in the extracted record, and usage monitoring is not stated, limiting MRV transparency.
Claim Safety
verified The project uses a project baseline and the VVB confirmed additionality, which helps reduce some claim risk.
missing Leakage is marked as not addressed, and there is no evidence in the extracted record for verified usage rates or quantified over-crediting checks.
Documentation
verified Multiple document types were used, including validation, monitoring, PDD, and issuance materials, and extraction confidence is high.
missing The monitoring period is relatively short and several key fields remain unstated, so the documentation set is incomplete for a full-quality assessment.
Detailed Analysis
Integrity
The monitoring report dated 2023-07-05 shows additionality was confirmed by the VVB, which supports the project’s core eligibility case. However, the extracted record does not state the additionality test type, buffer pool percentage, leakage deduction, or any reversal events, and leakage is explicitly marked as not addressed. With no reassessment date for the baseline and no quantified permanence treatment, integrity is only moderate.
Transparency
The project has a named verifier, 4K Earth Science Private Limited, and the monitoring report is dated and tied to a defined monitoring period from 2023-04-12 to 2023-06-30. Still, the record does not include claimed versus verified emission reduction totals, usage monitoring method, or any quantified registry issuance details. That leaves the MRV trail only partially transparent.
Claim Safety
Claim safety is weakened by the absence of verified emission reduction totals and the lack of any leakage treatment, which raises over-crediting concerns. The project baseline is project-specific rather than jurisdictional or standardized, and no verified usage rate is available in the extracted record. These gaps make the public claim less robust even though additionality was VVB-confirmed.
Documentation
The evidence base is reasonably broad, with validation, monitoring, PDD, and issuance documents listed, and extraction confidence is high. The project also has a defined crediting period from 2023-04-12 to 2030-04-11, which helps with recency. Even so, several important fields are not stated in available documents, so the documentation is incomplete for a high-confidence assessment.
Overall
I privileged the monitoring report dated 2023-07-05 for safeguard and VVB-related facts because it is the most specific and recent source in the extracted record. The contradictions on grievance mechanism and benefit sharing are not true factual conflicts within the provided evidence; they indicate that later extraction could not confirm those items, so I kept the monitoring report values and reduced confidence only modestly. Overall risk remains moderate because the project has some positive governance signals, but the absence of quantified leakage, reversal, and crediting data limits reliability.
Audit Analysis
This project has some positive safeguards and VVB involvement, but the extracted record leaves major gaps on additionality, leakage treatment, permanence, and credit quantification. The overall risk picture is moderate-to-high because several core carbon-accounting elements are not stated in the available documents.
Project Description
Proponent: WeAct Pty Ltd. Protocol categories: Waste handling and disposal Protocols: VM0044 Estimated annual GHG reductions: 21326 tCO2e Region: Asia Registration date: 2025-06-12
Red Flags
- No quantified leakage deduction or justification is provided, and reversal treatment is not addressed.
- Key crediting figures are missing, including claimed versus verified emission reductions, which limits confidence in over-crediting risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 10 | 0 | 10 | |
| Total | 10 | 0 | 10 |
Cosa migliorerebbe questo punteggio
- Publish the verified emission reduction totals, leakage treatment, and any buffer or reversal provisions in a clear issuance summary.
- Provide a complete MRV package showing the additionality test used, baseline reassessment timing, and quantified usage monitoring results.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal treatment stated
Leakage not addressed
Project baseline, reassessment not stated
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →