Biomass Based Cogeneration Units at Uttar Pradesh
#221of 352 in Biomass#858of 975 in India#1324of 1459 in CDM (UNFCCC)
Audit Analysis
This CDM biomass cogeneration project in Uttar Pradesh, India, received VVB-confirmed additionality via a barrier test, but the validation report identified 13 material findings including a barriers analysis that lacked project-specific documentary evidence. The project-specific baseline, contradictory leakage treatment between the PDD and validation report, and numerous monitoring gaps (missing FNRB, usage monitoring method, and verified ERR figure) significantly undermine confidence in the credit quality. The project did over-deliver relative to its pro-rata ex-ante expectation, which is a positive signal for claim conservatism.
Red Flags
- 13 material findings / corrective actions required at validation, including the barriers analysis lacking project-specific documentary evidence (CAR 4), undermining the additionality claim
- Leakage treatment contradicts between documents: the validation report deems it negligible while the PDD does not address it at all
- No verified ERR figure, FNRB value, or usage monitoring method found in the extracted record, leaving the MRV chain incomplete
- No FPIC, grievance mechanism, or feedstock sustainability assessment documented despite safeguards being mentioned
- One of the nine source documents is classified as 'unknown' type, reducing traceability
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but barriers analysis lacked project-specific
Avoidance project (grid displacement), no inherent reversal
Deemed negligible in validation report but not addressed in
Project-specific baseline, reassessment timing not stated
Safeguards and benefit sharing mentioned, but no FPIC or gri
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →