Biomass thermal energy plant – Hartalega Sdn.Bhd, Malaysia

CDM-1186 ↗

#89of 352 in Biomass#8of 16 in Malaysia#733of 1459 in CDM (UNFCCC)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

A CDM biomass energy project at Hartalega Sdn.Bhd in Malaysia with a VVB-confirmed barrier additionality test and a project-specific baseline. The monitoring report shows the project delivered only about 42% of the pro-rata ex-ante expectation for the elapsed crediting period, raising over-crediting concerns. Several material findings and corrective actions were required during validation, and key MRV parameters (fNRB, usage monitoring method) are not stated in the available documents.

Red Flags

  • Verified ERR of 162,246 tCO₂e over the ~3-year monitoring period is only ~42% of the pro-rata expectation (~385,761 tCO₂e) derived from the 900,108 tCO₂e lifetime ex-ante estimate in the validation report, suggesting the baseline may have been overestimated or the plant operated well below design capacity.
  • Leakage justification is contradictory: the validation report (2007) states 'deemed negligible' while the monitoring report (2010) states 'quantified,' yet the deduction is 0% in both cases.
  • Six material findings and six corrective actions were required during validation, including corrections to emissions calculation formulas and a requirement to demonstrate PKS surplus availability to rule out leakage.
  • Grid emission factor is from 2004, which is outdated relative to the 2008–2014 crediting period.

Credit Vintages

IssuedRetiredAvailable
2012
181,3000181,300
Total181,3000181,300

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment stated

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AM 0036

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents