Biomass thermal energy plant Hartalega Sdn.Bhd, Malaysia
#89of 352 in Biomass#8of 16 in Malaysia#733of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM biomass energy project at Hartalega Sdn.Bhd in Malaysia with a VVB-confirmed barrier additionality test and a project-specific baseline. The monitoring report shows the project delivered only about 42% of the pro-rata ex-ante expectation for the elapsed crediting period, raising over-crediting concerns. Several material findings and corrective actions were required during validation, and key MRV parameters (fNRB, usage monitoring method) are not stated in the available documents.
Red Flags
- Verified ERR of 162,246 tCO₂e over the ~3-year monitoring period is only ~42% of the pro-rata expectation (~385,761 tCO₂e) derived from the 900,108 tCO₂e lifetime ex-ante estimate in the validation report, suggesting the baseline may have been overestimated or the plant operated well below design capacity.
- Leakage justification is contradictory: the validation report (2007) states 'deemed negligible' while the monitoring report (2010) states 'quantified,' yet the deduction is 0% in both cases.
- Six material findings and six corrective actions were required during validation, including corrections to emissions calculation formulas and a requirement to demonstrate PKS surplus availability to rule out leakage.
- Grid emission factor is from 2004, which is outdated relative to the 2008–2014 crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 181,300 | 0 | 181,300 | |
| Total | 181,300 | 0 | 181,300 |
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, no reassessment stated
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →