Skip to main content
CDMEE supply sideChinaACM0012

Boiler retrofits to utilize semi-coke oven gas in Shenmu Zhugaita power generation Co., Ltd.

CDM-8345 ↗

#55of 1329 in Industrial#129of 1084 in China#219of 1459 in CDM (UNFCCC)#3of 28 in ACM0012

6.0/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
5.5
Documentation
7.0

Audit Analysis

A CDM energy-efficiency boiler retrofit project with strong additionality (negative IRR without CDM, VVB-confirmed combined test) but notable gaps in verified emissions data, an unusually high grid emission factor (1.3 tCO₂/MWh), and a contradiction in reported ERR figures. The project is methodologically sound under ACM0012 but lacks several transparency elements typical of higher-quality credits.

Red Flags

  • Grid emission factor of 1.3 tCO₂/MWh is significantly above China's national average (~0.5–0.8) and could inflate credit quantities if not representative of the actual local grid
  • Total verified ERR is not stated in any available document, making it impossible to confirm actual delivery against the 228,586 tCO₂e lifetime claim
  • Contradiction between two monitoring reports: 228,586 tCO₂e (June 2020) vs 14,494 tCO₂e (January 2020) both labelled as total claimed ERR
  • No buffer pool or permanence mechanism documented, though reversal risk is inherently lower for an energy-efficiency project

Credit Vintages

IssuedRetiredAvailable
2020
443,9850443,985
Total443,9850443,985

Risk Indicators

Additionality

VVB-confirmed combined test, negative IRR

Permanence

EE project (lower risk)

Leakage

0% per ACM0012, reasonable for EE

Baseline

Project-specific, modelled, no reassessment date

Safeguards

Mentioned; FPIC & grievance not detailed

Double-claim

CCP & CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0012

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.