Vai al contenuto principale
VCS Waste handling and disposal Brazil Registry: Registered Documentazione completa General Methodology v2.0

Brascarbon Methane Recovery Project BCA-BRA-19

VCS-4289 ↗

6.0 / 10
Integrity
7.0
Transparency
5.6
Claim Safety
6.0
Documentation
4.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core crediting case.

missing The baseline is project-specific and the last reassessment date is not stated in available documents.

Transparency

verified The verification report identifies the VVB as ICONTEC and provides a clear monitoring period for 2023.

missing The extracted record does not state the usage monitoring method, and the claimed-versus-verified emissions reduction comparison is not available.

Claim Safety

verified The project is a methane recovery activity with a quantified leakage deduction of 0%, which lowers over-crediting risk on leakage.

missing CORSIA eligibility is not stated, and the project’s baseline remains project-specific rather than jurisdictional or standardized.

Documentation

verified Seventeen documents were used and the verification report records no material findings and no corrective actions required.

missing Extraction confidence is low, and several important fields are not stated in available documents, including buffer pool coverage and usage monitoring details.

Detailed Analysis

Integrity

The verification report confirms additionality through an investment test and says the VVB, ICONTEC, found no material findings and no corrective actions were required. The project also reports no reversal events, which is appropriate for a methane recovery activity, but the buffer pool percentage is not found in the extracted record and the baseline is project-specific rather than recently reassessed. Leakage is treated with a quantified 0% deduction, which is positive, though the underlying justification is only partially visible in the extracted data.

Transparency

The verification report provides the VVB name and a clear monitoring period from 2023-01-01 to 2023-12-31, which helps traceability. However, the usage monitoring method is not stated in available documents, and the record does not provide a claimed-versus-verified emissions reduction comparison because total claimed emissions reductions are not found. Low extraction confidence further weakens confidence that the public documentation set is complete.

Claim Safety

Claim safety is helped by the VCS framework, VVB-confirmed additionality, and a quantified leakage deduction of 0%. Still, the baseline is project-specific, CORSIA eligibility is not stated, and several operational details relevant to over-crediting risk, such as verified usage rates, are not found in the extracted record. That leaves some residual uncertainty even though the core project type is relatively straightforward.

Documentation

Documentation is moderate rather than strong because 17 documents were used and the verification report is clean, with no material findings or corrective actions required. The score is pulled down by low extraction confidence and multiple missing or unstated items, including buffer pool coverage, baseline reassessment timing, and usage monitoring details. The crediting period is also not perfectly aligned across documents, which adds to the documentation uncertainty.

Overall

Overall, the project looks credible on core integrity, but the evidence package is incomplete enough to keep the score in the mid range. I privileged the 2025-07-10 verification report for the main facts because it is the most recent and authoritative document in the extracted set. The contradictions matter: leakage justification is shown as quantified in the later verification report rather than not addressed in an older document, reversal events are treated as none reported based on the later report, and the crediting period discrepancy was resolved in favor of the later date range because it is more recent and likely reflects the updated project record. Even so, the contradictions and low extraction confidence justify a downward adjustment to transparency and documentation.

Audit Analysis

This is a reasonably strong methane recovery project on integrity, with VVB-confirmed additionality, no material findings, and no reported reversals. However, transparency and documentation are weakened by low extraction confidence, missing public-facing MRV details, and several fields that are not stated in the extracted record.

Project Description

Proponent: Brascarbon Consultoria Projetos e Representacao S/A Protocol categories: Waste handling and disposal Protocols: AMS-III.D. Estimated annual GHG reductions: 57930 tCO2e Region: Latin America Registration date: 2024-02-19

Red Flags

  • The extracted record has low extraction confidence, which reduces trust in the completeness of the documentation.
  • Key MRV items such as the usage monitoring method and claimed-versus-verified emissions reductions are not stated in available documents.

Credit Vintages

Issued Retired Available
2022
52,007 1,587 50,420
2023
52,511 0 52,511
Total 104,518 1,587 102,931

Cosa migliorerebbe questo punteggio

  • Publish a complete MRV package showing the usage monitoring method, verified usage rates, and the claimed-versus-verified emissions reduction comparison.
  • Provide a clear reconciliation note for the crediting period discrepancy and disclose buffer pool coverage or other permanence safeguards.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals reported

Leakage

Quantified 0% deduction

Baseline

Project baseline, reassessment not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti