Bundled fossil fuel switching to NG(natural gas) project in Gyeonggi-do, Republic of Korea

CDM-3384 ↗

#236of 1329 in Industrial#9of 24 in South Korea#524of 1459 in CDM (UNFCCC)

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A straightforward CDM fuel-switching project (coal/oil to natural gas) in South Korea using the standardised AMS-III.B methodology, with additionality confirmed via an investment test by KEMCO. The validation report identified five corrective actions and one comment letter, indicating meaningful quality issues in the initial PDD that were subsequently addressed. The first monitoring period shows delivery close to pro-rata expectations, but several key parameters (FNRB, usage rates, buffer pool) are not stated in the available record.

Red Flags

  • Five corrective actions and one comment letter were raised during validation, including NPV calculation errors, unclear monitoring methods, and missing policy analysis in the investment test
  • The VVB (KEMCO) is a Korean government agency, raising independence concerns for the validation and verification process
  • Project-specific baseline with no documented reassessment; baseline robustness relies entirely on the initial PDD assumptions

Credit Vintages

IssuedRetiredAvailable
2012
6,29006,290
Total6,29006,290

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justified as negligible

Baseline

Project-specific, no reassessment recorded

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-III.B

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents