Carbon Project in the Emas-Taquari Biodiversity Corridor, Goiás and Mato Grosso do Sul, Brazil
#115of 261 in Soil carbon#111of 211 in Brazil#835of 1339 in Verra (VCS)
Audit Analysis
This VCS ALM soil-carbon project in Brazil has a VVB-confirmed additionality assessment and a 10% buffer pool, but is undermined by two fire-related reversal events, a significant reduction in the leakage deduction from 15% to 0% with the VVB itself flagging insufficient evidence, and 24 outstanding corrective actions. The project delivered only about 14% of its pro-rata ex-ante expectation for the monitored period, raising questions about baseline accuracy. Multiple contradictions across documents—particularly on leakage, buffer percentage, and ERR figures—reduce confidence in the data reliability.
Red Flags
- Leakage deduction reduced from 15% (validation report, 2010) to 0% (monitoring report, 2022) with the VVB's own CAR 10/2010 flagging 'lack of evidence to support assumption of zero leakage'
- Two fire events (July 2015, September 2020) caused reversals in a project where fire risk was scored at likelihood 5 (highest) with only a 0.5 mitigation factor
- Buffer pool reduced from 20% (validation report, 2010) to 10% (verification report, 2022) without clear justification in the extracted record
- 24 corrective actions and 16 CARs identified during the audit, including overestimation of biomass stocks in the first forest inventory
- ERR figures contradict between monitoring reports: 9,563.5 tCO2e (Oct 2021) vs 5,673.45 tCO2e (Mar 2022)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
Two fire reversals; buffer reduced to 10%
0% deduction; VVB flagged evidence gap
Project-specific; reassessed 2021 (within window)
FPIC and grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →