Skip to main content
CDMReforestationCosta RicaAR-AM0004

Carbon Sequestration in Small and Medium Farms in the Brunca Region, Costa Rica (COOPEAGRI Project)

CDM-7572 ↗

#16of 80 in ARR (afforestation)#739of 1459 in CDM (UNFCCC)

5.1/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A CDM reforestation project in Costa Rica with a verified barrier-test additionality assessment and independent VVB (AENOR), but significant concerns around baseline accuracy (the project delivered only ~46% of the pro-rata expectation for the first monitoring period), a project-specific baseline with no documented reassessment, and unquantified permanence protections. The safeguards documentation is inconsistent between the validation and monitoring reports, and FPIC was not conducted.

Red Flags

  • The verified ERR of 34,896 tCO₂e for the first monitoring period is only ~46% of the pro-rata expectation (~76,500 tCO₂e), raising serious questions about baseline accuracy and the validity of the ex-ante estimates.
  • The validation report (CAR 10) explicitly states the additionality assessment 'is not robust and clear,' and while corrective actions were subsequently resolved, the underlying weakness in the barrier analysis remains a concern.
  • Permanence is addressed only through tCERs with no quantified buffer pool percentage and reversal events explicitly 'not addressed' in the available documents.
  • FPIC was not conducted and the grievance mechanism is not stated in any available document, representing a gap in community safeguards for a project operating on small and medium farms.
  • Safeguards documentation is contradictory: the validation report references safeguards while the monitoring report does not, creating uncertainty about the project's actual safeguards compliance.
  • Buffer pool size not disclosed in available documents

Credit Vintages

IssuedRetiredAvailable
2013
23,084023,084
Total23,084023,084

Risk Indicators

Additionality

VVB-verified but flagged as not robust

Permanence

tCERs only, no buffer pool quantified

Leakage

0% deduction, minimal justification

Baseline

Project-specific, no reassessment documented

Safeguards

No FPIC, no grievance mechanism, inconsistent docs

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AR-AM0004

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents