Cartagena Landfill Gas Capture and Usage Project

CDM-6546 ↗

#154of 189 in Methane#113of 124 in Colombia#1344of 1459 in CDM (UNFCCC)#131of 159 in ACM0001

4.0/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The Cartagena Landfill Gas project has a VVB-confirmed additionality assessment and documented safeguards, but is undermined by ten material findings in the validation report, a project-specific modeled baseline, and a complete absence of leakage treatment in a project type where atmospheric escape is a realistic risk. No monitoring reports or verified emission figures are available, leaving the claimed 996,687 tCO₂e lifetime estimate unverified against actual performance.

Red Flags

  • Leakage is explicitly not addressed in a landfill gas capture project where uncollected methane escaping to the atmosphere is a well-known risk pathway
  • Ten material findings in the validation report, including discrepancies in historic waste volumes, waste composition data, and parameter type errors for 2018–2020, raise concerns about the reliability of the ex-ante emission estimates
  • No monitoring reports or verified emission reduction figures are available in the extracted record, so the 996,687 tCO₂e claimed figure cannot be cross-checked against actual performance
  • Contradiction within the same validation report: additionality test described as both 'investment' and 'combined'

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but test-type contradiction in validation repo

Permanence

No reversal data

Leakage

Explicitly not addressed in a landfill gas project

Baseline

Project-specific modeled baseline; no reassessment data

Safeguards

FPIC and benefit sharing documented; grievance mechanism not

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents