Skip to main content
CDMN2OThailandAM0028

Catalytic N2O Abatement Project in the tail gas of the Caprolactam production plant in Thailand

CDM-2232 ↗

#64of 189 in Methane#25of 48 in Thailand#821of 1459 in CDM (UNFCCC)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A CDM N2O abatement project in Thailand's caprolactam sector with VVB-confirmed additionality and a measured project-specific baseline, but weakened by the absence of a buffer pool, a 0% leakage deduction supported by contradictory justifications across monitoring reports, and a notable gap in verified ERR figures. The project's documentation is reasonably complete (12 sources, high extraction confidence) yet lacks grievance mechanisms, FPIC, and safeguards documentation, and the PDD required seven material corrections at validation.

Red Flags

  • Leakage justification is contradictory: the 2013 monitoring report states 'quantified' while the 2012 report states 'deemed negligible', yet the deduction is 0% in both cases — a quantified result of zero is unusual and the inconsistency undermines confidence in the leakage assessment.
  • No buffer pool is recorded for permanence risk, and no reversal events are confirmed either way; for a catalytic abatement unit, catalyst degradation or unplanned shutdown could reverse credits with no safety net.
  • Total ERR verified is not stated in any available document; only the claimed figure (10,288 tCO2e) is available, leaving the actual verified reduction unconfirmed.
  • Safeguards, FPIC, and grievance mechanism are all absent or explicitly false in the later monitoring reports, despite the validation report (2009) having mentioned safeguards — a regression in documented social compliance.

Credit Vintages

IssuedRetiredAvailable
2011
37,422037,422
2012
98,865098,865
2013
163,8640163,864
Total300,1510300,151

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unaddressed

Leakage

0% deduction with contradictory justification

Baseline

Project-specific, measured; no reassessment data

Safeguards

No FPIC, grievance mechanism, or safeguards

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AM0028

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents