CGN Hami Phase I 20MWp Grid-connected PV Power Plant Project

VCS-1248 ↗

5.4 / 10
Integrity
5.8
Transparency
5.2
Claim Safety
4.6
Documentation
6.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which is stronger than an unverified assertion.

missing The monitoring report states leakage is not addressed, and the record contains a major discrepancy between claimed and verified emission reductions.

Transparency

verified The project has multiple official documents available, including validation, monitoring, PDD, and issuance records, and the extraction confidence is high.

missing The monitoring report does not state a usage monitoring method, and the emission reduction figures are inconsistent across documents.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of dual-market claim risk.

missing The baseline is project-specific rather than a more conservative standardized baseline, and the leakage treatment is weak or missing in the latest monitoring report.

Documentation

verified The record includes a substantial document set and the extraction confidence is high, which supports basic documentation quality.

missing Corrective actions were required for incorrect coordinates and revised emission reduction estimates, and the crediting period is inconsistent across documents.

Detailed Analysis

Integrity

The project’s additionality is supported because the VVB confirmed an investment test in the monitoring record, and no material findings were reported. That said, the latest monitoring report says leakage is not addressed, which weakens the integrity case for a grid-connected renewable project. The large gap between claimed and verified emission reductions also raises over-crediting concerns and reduces confidence in the accounting.

Transparency

Transparency is moderate because the file set includes validation, monitoring, PDD, and issuance documents, and the extraction confidence is high. However, the monitoring report does not state a usage monitoring method, and the emission reduction totals vary materially across documents. Those inconsistencies make it harder to trace the final credited amount with confidence.

Claim Safety

Claim safety is limited by the project-specific baseline and the weak leakage treatment in the latest monitoring report. The project is explicitly not CORSIA-eligible, which helps reduce dual-market risk, but there is still a meaningful over-crediting concern because the verified reductions are far below the claimed amount. The absence of a clear, current leakage justification further lowers confidence in the claim.

Documentation

Documentation quality is fair because multiple official documents were used and the extraction confidence is high. Still, the monitoring report required corrective actions for incorrect coordinates and revised emission reduction estimates, which indicates documentation issues. The conflicting crediting period dates between documents also suggest the record is not fully internally consistent.

Overall

I privileged the more recent monitoring report for operational details such as leakage treatment, safeguards, and the current verified reduction figure, while noting that the validation report and PDD provide earlier baseline and methodology context. The contradictions are material: additionality is reported as confirmed in the monitoring record but denied in the PDD, verified reductions differ sharply across validation documents, leakage is quantified in earlier material but not addressed in the monitoring report, and the crediting period conflicts between documents. These discrepancies reduce reliability and justify a conservative overall score.

Audit Analysis

This is a registered VCS solar project with VVB-confirmed additionality and no reported material findings, which supports moderate integrity. However, the record shows important reliability issues: the claimed and verified emission reduction figures differ sharply across documents, leakage is not addressed in the monitoring report, and the crediting period appears inconsistent between documents.

Project Description

Proponent: CGN Solar Power Development Co., LTD Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 22893 tCO2e Region: Asia Registration date: 2014-02-26

Red Flags

  • Large discrepancies in emission reduction figures across validation and monitoring documents
  • Leakage is marked as not addressed in the monitoring report despite a quantified approach appearing in earlier validation material
  • Crediting period dates conflict between documents, creating uncertainty about which period governs the current issuance

Credit Vintages

Issued Retired Available
2011
21,576 0 21,576
2012
313 0 313
2013
27,123 0 27,123
2014
26,838 0 26,838
2015
26,606 0 26,606
2016
26,359 0 26,359
2017
26,064 0 26,064
2018
25,378 0 25,378
2019
25,361 0 25,361
2020
24,846 0 24,846
2021
24,245 0 24,245
Total 254,709 0 254,709

Cosa migliorerebbe questo punteggio

  • Provide a reconciled emissions accounting table that explains the differences between claimed and verified reductions across all documents.
  • Publish a clear, current leakage assessment and a consistent statement of the applicable crediting period and baseline treatment.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but contradicted in PDD

Permanence

Avoidance project with no reversal events reported

Leakage

Leakage not addressed in latest monitoring report

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

FPIC, grievance mechanism, and safeguards documented

Double-claim

Not CORSIA-eligible and no CCP approval stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti