Dissemination of improved stoves (Mogogo) in the Eritrean highlands

GS-1173 ↗ · current registry ID: GS748

#1047of 1329 in Industrial#34of 38 in Eritrea#1492of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
3.8
Claim Safety
4.2
Documentation
4.3

Audit Analysis

This Gold Standard cookstove project in Eritrea delivered only about 48% of its PDD-estimated emission reductions, with a declining verified usage rate and no buffer pool in place. Seven data contradictions across documents—including conflicting FNRB methods, leakage justifications, and additionality test types—undermine confidence in the underlying data. The absence of a named VVB and a verified ERR figure further weakens the transparency and claim-safety profile.

Red Flags

  • Actual emission reductions (4,891 tCO2e) were less than half the PDD estimate (10,220 tCO2e), attributed to fewer stoves installed and adjusted fuel savings (monitoring report, 2020).
  • Verified usage rate declined from 0.991 (2014 monitoring report) to 0.90 (2020 monitoring report), falling below the 0.96 assumed in the PDD.
  • No buffer pool percentage is stated in any available document, and reversal events are marked as 'not addressed' despite the cookstove asset having a finite service life.
  • The FNRB method is reported as 'national default' in the 2020 monitoring report but 'local field' measurement in the PDD (2010), a material discrepancy that could affect the baseline.
  • The VVB name is not stated in any extracted document, and additionality verification by the VVB is not confirmed.

Credit Vintages

IssuedRetiredAvailable
2009
1,2711,2710
2010
3,1663,1660
2011
2,7202,7200
2012
2,6842,6840
2013
2,5532,5530
2014
2,2222,2220
2015
2,3442,32321
2016
2,6972,64453
2017
2,6822,62953
2018
2,1082,1080
2019
1,2541,2540
Total25,70125,574127

Risk Indicators

Additionality

Combined test in PDD but VVB confirmation not stated

Permanence

reversal events not addressed

Leakage

0% deduction; justification inconsistent across reports

Baseline

Project-specific; FNRB method contradicts between PDD and monitoring

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents