Distribution of Energy Savings Lamps in Madagascar - Project 1
Score Breakdown
Integrity
verified Additionality uses a combined test and the project was verified by SustainCERT, which supports some robustness.
missing Leakage is marked as not addressed in the verification report, and reversal handling is not clearly resolved despite CFL collection and recycling being described.
Transparency
verified The monitoring period, VVB name, methodology version, and registry are stated, giving a basic audit trail.
missing Total claimed and verified emission reductions are not found in the extracted record, and the extraction confidence is only medium.
Claim Safety
verified The project is an energy-efficiency domestic project under Gold Standard, with FPIC conducted and a grievance mechanism present.
missing The baseline is project-specific rather than a recently reassessed standardized baseline, and leakage treatment is inconsistent across documents.
Documentation
verified Three core document types were used, including the PDD, monitoring report, and verification report.
missing The verification report required corrective actions and a forward action request, and the record contains several unresolved gaps and contradictions.
Detailed Analysis
Integrity
The verification report from SustainCERT confirms a combined additionality test, which is a positive sign, but it does not clearly confirm additionality in a way that fully closes the risk. Leakage is a major weakness: the verification report says it is not addressed, while the older monitoring report had a quantified treatment, so I privilege the later verification report as the more authoritative source for current project quality. The project also describes CFL collection and recycling, but reversal events are still not clearly resolved in the extracted record.
Transparency
The record identifies the Gold Standard registry, the monitoring period, the methodology version, and the VVB, which supports basic traceability. However, the extracted facts do not include total claimed or verified emission reductions, and the minimum extraction confidence is only medium, so the documentation trail is incomplete. The annual survey method is stated, but the absence of quantified issuance figures limits transparency.
Claim Safety
Claim safety is weakened by the project-specific baseline and the inconsistent treatment of leakage across documents. FPIC was conducted and a grievance mechanism is present, which helps reduce social-risk concerns, but the project still lacks a clear, consistently documented leakage justification. Because CORSIA eligibility and CCP status are not stated, I cannot treat dual-claim risk as excluded.
Documentation
The evidence base includes the PDD, monitoring report, and verification report, which is a reasonable document set. Still, the verification report issued a forward action request and corrective actions, including better household identification and closer monitoring of CFL collection and recycling, showing that the documentation was not fully clean. The crediting period also conflicts with the PDD, and the later verification report is the more specific and recent source, so I privilege it for scoring while discounting confidence due to the inconsistency.
Overall
Overall, this is a moderately documented project with some positive safeguards and third-party verification, but the quality is held back by unresolved leakage treatment, incomplete issuance data, and several documentation inconsistencies. I privilege the later verification report over the older PDD and monitoring report where they conflict, because it is the most recent and audit-focused source. The contradictions on leakage, reversal handling, and crediting period reduce reliability and justify a cautious score.
Audit Analysis
This is a standard Gold Standard energy-efficiency project with some positive safeguards and a VVB verification, but the record has important gaps around leakage, reversal handling, and quantified issuance data. The documentation is usable, yet several key values are missing or inconsistent, which limits confidence in the crediting claim.
Project Description
Developer: myclimate Foundation Type: Energy Efficiency - Domestic Size: Micro scale Methodology: AMS-II.J. Demand-side activities for efficient lighting technologies Crediting period: 2015-01-01 → 2024-12-21 Estimated annual credits: 5229 tCO2e SDGs: Goal 17: Partnerships for the Goals, Goal 7: Affordable and Clean Energy, Goal 1: No Poverty, Goal 12: Responsible Production and Consumption, Goal 13: Climate Action
Red Flags
- Leakage is not addressed in the verification report, despite an earlier monitoring report indicating a quantified treatment.
- The project documents conflict on the crediting period and on whether reversal-related handling was reported, which raises reliability concerns.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 6,929 | 6,929 | 0 | |
| 2016 | 6,391 | 6,391 | 0 | |
| 2017 | 5,854 | 5,854 | 0 | |
| 2018 | 4,808 | 4,808 | 0 | |
| 2019 | 4,144 | 4,144 | 0 | |
| Total | 28,126 | 28,126 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a clear, quantified leakage assessment and reconcile it across the monitoring and verification reports.
- Publish verified issuance figures and resolve the crediting-period and reversal-handling inconsistencies in a single updated audit trail.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Combined test present, VVB confirmation unclear
No clear reversal event resolution
Leakage treatment inconsistent
Project-specific baseline
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- (1)Monitoring Report_1st monitoring period_01.01.2015 to 31.12.2015_v2.pdf
- 220826_GS1334_ERs_calculation_2019_Round I (2) (1).xlsx
- (1)Monitoring Report_4th monitoring period_01.01.2018 to 31.12.2018_v1.doc
- (1)Monitoring Report_2nd monitoring period_01.01.2016 to 31.12.2016_v1.pdf
- (1)Monitoring Report_3rd monitoring period_01.01.2017 to 31.12.2017_v2.pdf
- GS1334 MR2019_Final (1).docx
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →