VCSA_Verification_Report 10-297 15 MW Biomass Residue Based Power Plant 2011-07-05

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
15 MW Biomass Residue Based Power Project At Ghazipur, India (VCS-624)
Document type
Verification Report
Registry
Verra
Retrieved from the registry
File
VCSA_Verification_Report 10-297 15 MW Biomass Residue Based Power Plant 2011-07-05.pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.3/10Re-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Verra. VCSA_Verification_Report 10-297 15 MW Biomass Residue Based Power Plant 2011-07-05 (Verification Report), 15 MW Biomass Residue Based Power Project At Ghazipur, India (VCS-624). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/15-mw-biomass-residue-based-power-project-at-ghazipur-india-42fe98/48debbb0e11e4738/.