15 MW Biomass Residue Based Power Project At Ghazipur, India
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification record reports no material findings.
missing The baseline is project-specific rather than a recently reassessed standardized baseline, and leakage is not quantified in the extracted record.
Transparency
verified The project has a named VVB and a clearly stated monitoring period in the monitoring report.
missing Several key monitoring details are missing or inconsistent, including the claimed-versus-verified ER figures and the leakage treatment.
Claim Safety
verified The project is marked as not CORSIA-eligible, which reduces dual-market claim risk.
missing The baseline is project-specific and the leakage justification is only described as negligible, which leaves some over-crediting risk unresolved.
Documentation
verified The record draws on multiple official documents, including the PDD, validation report, monitoring report, and issuance materials.
missing The monitoring report contains numerous corrective actions and the extraction record notes at least one poorly structured source through an unknown document entry.
Detailed Analysis
Integrity
The monitoring and validation materials support a reasonable integrity score because additionality was confirmed by the VVB and the verification record reports no material findings. That said, the baseline is project-specific, the last reassessment date is not stated, and leakage is only described as negligible rather than backed by a clear deduction percentage. The absence of reversal events is not confirmed in the extracted record, so permanence evidence is incomplete.
Transparency
Transparency is moderate because the project has a named verifier, a stated monitoring period, and a verified emissions reduction figure of 403,634 in the validation record. However, the extracted record does not provide a claimed emissions total, the usage monitoring method is not stated, and the leakage treatment is not fully quantified. These gaps limit how fully an external reviewer can reconstruct the issuance basis.
Claim Safety
Claim safety is middling because the project is explicitly marked as not CORSIA-eligible, which lowers the risk of overlapping international claims. Even so, the project uses a project-specific baseline and the leakage justification is only described as negligible, with no deduction percentage stated. The contradiction between a quantified leakage treatment in the validation report and a negligible treatment in the monitoring report also weakens confidence in the net claim.
Documentation
Documentation quality is fair but not strong. The record includes multiple official sources and high extraction confidence, and the VVB is identified. However, the monitoring report lists many corrective actions, including missing calibration details, biomass assessment support, and clarification on gross generation during shutdown days, which indicates the documentation package needed substantial follow-up.
Overall
I privileged the more recent monitoring report for operational items such as safeguards, grievance mechanism, FPIC, and leakage characterization, because it is later and appears to reflect the final monitored state. I privileged the validation report for the verified emissions figure because it is the formal assurance source, but the two documents conflict on the additionality test, crediting period, leakage treatment, and emissions totals, so reliability is reduced. Under the scoring rules, the project avoids a severe integrity penalty because additionality was VVB-confirmed, but the contradictions and missing quantification keep the overall score in the mid-range.
Audit Analysis
This is a registered VCS biomass project with VVB-confirmed additionality and no material findings reported, which supports moderate integrity. However, the record shows several documentation inconsistencies, a project-specific baseline, and leakage treatment that is described as negligible rather than quantified, which keeps confidence and claim safety only mid-range.
Project Description
Sukhbir Agro Energy Limited's project in Ghazipur district, India involves the installation of a new boiler and steam turbine to generate renewable electricity using rice husks, a by-product of paddy processing. With the ability to export surplus power to the regional grid, this project replaces grid-based electricity with biomass residues, significantly reducing GHG emissions. The project has been registered as CDM project activity with the CDM EB (reference No. 2708).
Red Flags
- The monitoring and validation records disagree on several core items, including the additionality test, crediting period, leakage treatment, and reported emission reductions.
- Leakage is described as negligible in the monitoring report, but no deduction percentage is stated and the validation report indicates a quantified treatment, creating a reliability gap.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 65,347 | 65,347 | 0 | |
| Total | 65,347 | 65,347 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a fully reconciled emissions accounting table that explains the discrepancy between claimed and verified reductions, plus the differing figures across validation documents.
- Quantify leakage explicitly, document any reversal or buffer arrangements, and add a clear baseline reassessment history with supporting evidence.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal evidence stated
Negligible but unquantified
Project-specific baseline
FPIC and grievance mechanism present
Not CORSIA-eligible; CCP status unstated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →