Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

Verification Report_1st monitoring period_30.03.2017 to 31.07.2018_v4

Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan- Pre CDM Clone (GS-1746)
Document type
Verification Report
Registry
Gold Standard
Retrieved from the registry
File
Verification Report_1st monitoring period_30.03.2017 to 31.07.2018_v4.pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.5/10Rated

See CarbonMeld's analysis of this project →

Cite this document

Gold Standard. Verification Report_1st monitoring period_30.03.2017 to 31.07.2018_v4 (Verification Report), 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan- Pre CDM Clone (GS-1746). CarbonMeld copy, retrieved from the registry on 4 Oct 2026: https://carbonmeld.com/projects/docs/20-mw-solar-project-in-sanwreej-jodhpur-rajasthan-pre-cdm-cl-612aa7/20766972da2a8fec/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.