Registry document
Verification Report_1st monitoring period_30.03.2017 to 31.07.2018_v4
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan- Pre CDM Clone (GS-1746)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Verification Report_1st monitoring period_30.03.2017 to 31.07.2018_v4.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.5/10Rated
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Verification Report_1st monitoring period_30.03.2017 to 31.07.2018_v4 (Verification Report), 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan- Pre CDM Clone (GS-1746). CarbonMeld copy, retrieved from the registry on 4 Oct 2026: https://carbonmeld.com/projects/docs/20-mw-solar-project-in-sanwreej-jodhpur-rajasthan-pre-cdm-cl-612aa7/20766972da2a8fec/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
