20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan- Pre CDM Clone
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using a combined test, and the verification report reports no material findings.
missing Leakage justification is not addressed in the verification report, and no leakage deduction is stated.
Transparency
verified The project has a named VVB, a defined monitoring period, and a verification report dated 2019-02-12.
missing Verified and claimed emissions reduction totals are not stated in the extracted record, and usage monitoring details are missing.
Claim Safety
verified The project uses ACM0002 for a solar electricity activity, which is a standardised renewable methodology.
missing Leakage treatment is unclear and the record contains a contradiction on whether leakage was deemed negligible, increasing over-crediting risk.
Documentation
verified Multiple document types were used, including validation, monitoring, verification, and PDD sources.
missing Minimum extraction confidence is only medium, and several important fields are not stated in available documents.
Detailed Analysis
Integrity
The verification report from EPIC Sustainability Services Private Limited confirms additionality through a combined test and reports no material findings or corrective actions. Baseline method is described as project-based, but the baseline was not shown to have been recently reassessed, and leakage treatment is weak because the verification record says it is not addressed. Reversal risk is not a major issue for a solar electricity project, but the record does not provide a buffer pool or explicit reversal treatment.
Transparency
Transparency is moderate because the project has a named verifier, a clear monitoring period from 2017-03-30 to 2018-07-31, and a dated verification report. However, the extracted record does not state verified or claimed emissions reductions, usage monitoring method, or any FNRB method/value, which limits public MRV clarity. The registry is identified as CDM, but the record does not provide enough complete emissions accounting detail to score higher.
Claim Safety
Claim safety is middling because the project is a standard grid-connected solar activity under ACM0002, which generally supports conservative accounting. That said, leakage is not addressed in the verification report, and the contradiction notes another document reportedly treated leakage as negligible; I privileged the verification report because it is the more recent and higher-assurance document, but the inconsistency still raises over-crediting risk. No CORSIA or CCP status is stated, so dual-market risk cannot be ruled out from the extracted record.
Documentation
Documentation is reasonably broad, with validation, monitoring, verification, and PDD documents all represented and seven documents used in extraction. Still, the extraction confidence is only medium, and several key fields are missing rather than merely unspecified, including emissions totals, leakage deduction, and usage monitoring details. The crediting period also conflicts with the PDD version; I privileged the verification report because it is later and reflects the period actually covered by verification.
Overall
The project looks better than average on additionality and basic project documentation, but it is held back by incomplete MRV disclosure and weak leakage treatment. Two contradictions matter: leakage is described as not addressed in the verification report but reportedly deemed negligible in another document, and the crediting period differs between the verification report and the PDD. I privileged the verification report in both cases because it is the more recent and assurance-backed source, but the contradictions still reduce confidence and keep the overall score in the mid range.
Audit Analysis
This is a grid-connected solar project with VVB-confirmed additionality and no reported material findings, which supports a moderate integrity score. However, leakage treatment is weakly documented, several key MRV fields are not stated in the extracted record, and there is a contradiction on the crediting period and leakage justification that reduces confidence.
Project Description
Developer: Infinite Environmental Solutions LLP Type: Solar Thermal - Electricity Size: Large scale Methodology: Other Crediting period: 2017-07-30 → 2018-07-31 Estimated annual credits: 34882 tCO2e SDGs: Goal 12: Responsible Production and Consumption, Goal 13: Climate Action
Red Flags
- Leakage is not addressed in the verification record, while another document reportedly described it as negligible; the inconsistency weakens reliability.
- Key MRV details such as verified emissions reductions, usage monitoring, and leakage deduction are not stated in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 26,472 | 26,472 | 0 | |
| 2018 | 24,329 | 24,321 | 8 | |
| Total | 50,801 | 50,793 | 8 |
Cosa migliorerebbe questo punteggio
- Publish the verified emissions reduction figures, leakage treatment, and usage monitoring details in a complete MRV package.
- Resolve the crediting-period and leakage contradictions with a reconciled document trail and clearer version control across PDD, validation, and verification records.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
Solar avoidance project; no reversal events reported
Leakage not addressed
Project baseline stated, reassessment timing missing
FPIC, grievance mechanism, and safeguards mentioned
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →