Registry document
Monitoring Report_monitoring period_07-03-2019 to 31-12-2019_v2
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 200 MW Wind Power Project in Tamil Nadu by Orange Sironj (GS-1096)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring Report_monitoring period_07-03-2019 to 31-12-2019_v2.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 4.0/10Rated
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Monitoring Report_monitoring period_07-03-2019 to 31-12-2019_v2 (Monitoring Report), 200 MW Wind Power Project in Tamil Nadu by Orange Sironj (GS-1096). CarbonMeld copy, retrieved from the registry on 14 Apr 2026: https://carbonmeld.com/projects/docs/200-mw-wind-power-project-in-tamil-nadu-by-orange-sironj-bdae55/57a75bed2fd338aa/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
