200 MW Wind Power Project in Tamil Nadu by Orange Sironj
Score Breakdown
Integrity
verified The verification report confirms additionality through an investment test, and the VVB is named as Applus+ Certification.
missing Leakage treatment is not addressed in the monitoring record, and buffer pool coverage is not stated.
Transparency
verified The monitoring period and verified emission reductions are stated in the 2024 monitoring report, with 650,601 verified credits.
missing Public-facing completeness is weakened by missing usage monitoring details, no claimed-versus-verified comparison, and low extraction confidence.
Claim Safety
verified The project is a wind power activity under ACM0002 with a recently reassessed baseline in 2024, which is generally lower-risk than many project types.
missing CORSIA eligibility is true while CCP status is not stated, and leakage justification is inconsistent across documents.
Documentation
verified The record draws on many documents, and the monitoring report is dated 2024-12-12, which is reasonably recent.
missing Extraction confidence is low, and the file contains several unresolved contradictions plus multiple CARs and CLs from verification.
Detailed Analysis
Integrity
The project has a solid starting point because the verification report confirms additionality through an investment test, and the monitoring record shows no reported reversal events. Still, integrity is weakened by the absence of a stated buffer pool percentage, no leakage deduction, and leakage justification marked as not addressed in the extracted record. The project is a wind power activity under ACM0002, which is generally favorable, but the evidence is incomplete on permanence-related safeguards.
Transparency
Transparency is only moderate because the monitoring period is clearly stated and the verified emissions figure is available, but the claimed emissions figure is not found in the extracted record. Usage monitoring is not described, and no FNRB or grid-factor details are available in the extracted facts. The low extraction confidence also suggests at least one key source was difficult to read, reducing documentation clarity.
Claim Safety
Claim safety is mixed. A wind project under ACM0002 with a 2024 baseline reassessment is generally less exposed to over-crediting than older or project-specific baselines, but the record does not provide the grid emission factor, usage monitoring, or leakage deduction needed to fully test the claim. CORSIA eligibility is true, while CCP status is not stated, so dual-market claim risk cannot be ruled out from the extracted record alone.
Documentation
Documentation quality is limited by the low extraction confidence and the presence of many verification findings, including multiple CARs and CLs. The monitoring report is recent, but the extracted record does not provide a complete set of supporting details such as buffer pool coverage, usage monitoring, or a clear claimed-versus-verified comparison. The contradictions also indicate that the document set is not fully internally consistent.
Overall
Overall, this looks like a reasonably credible wind project, but not a high-confidence one. I privileged the most recent monitoring report for reversal status and the VVB-confirmed verification report for additionality, while noting that earlier documents conflict on benefit sharing, FPIC, leakage, reversal treatment, and the crediting period; those contradictions reduce reliability and justify a downward adjustment. Because documentation quality is weak and several key safeguards are missing or unstated, the project should be treated as moderate risk rather than robustly low risk.
Audit Analysis
This is a renewable wind project with VVB-confirmed additionality and no reported reversals, which supports the core integrity case. However, several key items are missing or weakly documented, including leakage treatment, usage monitoring, and buffer pool information, and the extracted record contains multiple contradictions that reduce confidence.
Project Description
Developer: Orange Renewable Power Pvt Ltd Type: Other Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2019-03-07 → 2029-03-06 Estimated annual credits: 613844 tCO2e SDGs: Goal 4: Quality Education, Goal 3: Good Health and Well-Being, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth, Goal 6: Clean Water and Sanitation, Goal 13: Climate Action
Red Flags
- Leakage is not addressed in the extracted record, despite an earlier document saying it was deemed negligible.
- The record contains contradictions on benefit sharing, FPIC, reversal treatment, and the crediting period, which weakens reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 447,192 | 447,192 | 0 | |
| 2020 | 555,025 | 555,025 | 0 | |
| 2021 | 521,010 | 300,877 | 220,133 | |
| 2022 | 512,411 | 0 | 512,411 | |
| Total | 2,035,638 | 1,303,094 | 732,544 |
Cosa migliorerebbe questo punteggio
- Publish a clear leakage assessment, including whether any deduction applies and why.
- Provide a complete public package with buffer pool coverage, usage monitoring, and a reconciled explanation of all document contradictions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversals reported, buffer not stated
Leakage not addressed consistently
Project baseline with reassessment timing known
FPIC and grievance mechanism present, but inconsistencies re
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →