Registry document
Monitoring Report_monitoring period_07-03-2019 to 30-09-2019_v2
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 200 MW Wind Power Project in Tamil Nadu by Orange Sironj (GS-1096)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring Report_monitoring period_07-03-2019 to 30-09-2019_v2.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 7.4/10Scored
See CarbonMeld's analysis of this project →