Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

project design document

Published by Clean Development Mechanism for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
22.5 MW grid connected wind farm project by RSMML in Jaisalmer, India. (CDM-1602)
Document type
Project Design Document
Registry
Clean Development Mechanism
Retrieved from the registry
File
project design document

Open the PDFRegistry record of the project ↗

AnalysisRe-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Clean Development Mechanism. project design document (Project Design Document), 22.5 MW grid connected wind farm project by RSMML in Jaisalmer, India. (CDM-1602). CarbonMeld copy, retrieved from the registry on 13 Apr 2026: https://carbonmeld.com/projects/docs/22-5-mw-grid-connected-wind-farm-project-by-rsmml-in-jaisalm-36c4d7/0192dcda4493a6c5/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.