22.5 MW grid connected wind farm project by RSMML in Jaisalmer, India.

CDM-1602 ↗

#1340of 1935 in Renewable energy#716of 975 in India#1062of 1459 in CDM (UNFCCC)#1039of 1287 in ACM0002

4.6/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A 22.5 MW CDM wind project in Jaisalmer, India, with VVB-confirmed additionality and CORSIA eligibility, but undermined by five corrective action requests, a PDD-to-actual-installation mismatch, an unaddressed leakage justification, and a grid emission factor frozen at 2007 values. The project's avoidance-type nature limits reversal risk, yet the volume of material findings and the absence of a verified ERR figure in the extracted record raise meaningful concerns about the robustness of the credit claim.

Red Flags

  • PDD specification does not match the windmills actually installed (CL-1 in the 2019 monitoring report), casting doubt on the accuracy of the ex-ante ERR estimate of 282,910 tCO₂e
  • Five corrective action requests (CAR-1 through CAR-3) and five compliance-level findings (CL-1 through CL-5) were raised in the 2019 monitoring report, including an inadequately justified additionality analysis (Step 3 alone) and a monitoring method that failed to account for other clients' turbines on the same meter
  • Grid emission factor of 0.8971 tCO₂/MWh is anchored to 2007 data; no updated or reassessed value is found in the extracted record for a project operating through 2018
  • Leakage justification is recorded as 'not addressed' in the most recent monitoring report (May 2019), contradicting an earlier 2017 report that described it as 'deemed negligible'
  • Total verified ERR for the monitoring period (Jan 2017 – Dec 2018) is not found in the extracted record, preventing any pro-rata delivery check against the 282,910 tCO₂e lifetime claim

Credit Vintages

IssuedRetiredAvailable
2011
42,316042,316
2013
53,467053,467
2015
41,424041,424
2017
32,540032,540
2019
25,028025,028
Total194,7750194,775

Risk Indicators

Additionality

VVB-confirmed but Step 3-only gap flagged (CAR-1)

Permanence

Avoidance-type wind; no reversal risk inherent

Leakage

0% deduction but justification 'not addressed' in 2019 repor

Baseline

Project-specific; grid EF frozen at 2007; doc contradiction

Safeguards

FPIC conducted, grievance mechanism present, safeguards docu

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents