Registry document
Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 40 MW Orange Charanka Solar Power Project in Gujarat, India (GS-1377)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 6.2/10Re-assessment pending
See CarbonMeld's analysis of this project →