Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2

Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
40 MW Orange Charanka Solar Power Project in Gujarat, India (GS-1377)
Document type
Verification Report
Registry
Gold Standard
Retrieved from the registry
File
Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2.pdf

Open the PDFRegistry record of the project ↗

AnalysisRe-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Gold Standard. Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2 (Verification Report), 40 MW Orange Charanka Solar Power Project in Gujarat, India (GS-1377). CarbonMeld copy, retrieved from the registry on 14 Apr 2026: https://carbonmeld.com/projects/docs/40-mw-orange-charanka-solar-power-project-in-gujarat-india-f4adbe/ceead72bc1fad543/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.