Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN

Registry document

Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2

Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
40 MW Orange Charanka Solar Power Project in Gujarat, India (GS-1377)
Document type
Verification Report
Registry
Gold Standard
Retrieved from the registry
File
Final Verification Report_monitoring period_1-8-2018 to 29-02-2020_v2.pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 6.2/10Re-assessment pending

See CarbonMeld's analysis of this project →