Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test in the validation report dated 2018-04-20.
missing Leakage treatment is not addressed, and no buffer pool or reversal management detail was found in the available record.
Transparency
verified The project is identified under Gold Standard with a named VVB, Applus+ LGAI, and the record shows no material findings or corrective actions required.
missing The monitoring period, claimed versus verified emission reductions, and usage monitoring details are not stated in the extracted documents.
Claim Safety
verified The project uses ACM0002 Version 17.0, a standard methodology for grid-connected renewable power, which supports baseline credibility.
missing Leakage is not addressed and no FNRB value or usage-rate evidence is available, which leaves some over-crediting risk unresolved.
Documentation
verified The extracted record comes from an official validation report with high extraction confidence and a named independent verifier.
missing Only one document was used, and several core fields such as crediting period, monitoring period, and buffer pool coverage were not found in the available documents.
Detailed Analysis
Integrity
The validation report confirms additionality through an investment test and shows no material findings, which is a meaningful positive signal. At the same time, leakage is explicitly not addressed, and the extracted record does not show any buffer pool percentage or reversal-event treatment, so permanence and leakage controls remain incomplete in the available evidence.
Transparency
Transparency is helped by the presence of a named verifier, Applus+ LGAI, and a clearly identified Gold Standard project record. But the extracted documents do not state the monitoring period, total emission reductions claimed or verified, or the usage monitoring method, so MRV completeness is limited.
Claim Safety
Claim safety is moderately supported by the use of ACM0002 Version 17.0 for a grid-connected solar project, which is a recognized baseline framework. Still, leakage is not addressed and no FNRB value, usage-rate evidence, or quantified emission reduction reconciliation is available, so over-crediting risk cannot be ruled out confidently.
Documentation
Documentation quality is limited by the fact that only one official document was used, even though extraction confidence is high. The report is recent enough to support validation-level review, but key fields such as crediting period, monitoring period, and buffer pool coverage were not found in the available record, reducing completeness.
Overall
There are no contradictions listed in the extracted record, so no document hierarchy decision was needed. The main limitation is not inconsistency but missing evidence: several core MRV and risk-control fields are absent, especially leakage treatment, buffer pool coverage, and monitoring-period data. Because integrity remains above the low-confidence gate, the overall score is not capped, but the project still lands in the middle range due to documentation gaps and unresolved claim-safety questions.
Audit Analysis
This is a utility-scale solar project with VVB-confirmed additionality and no material findings reported, which supports a moderate integrity score. However, several key risk controls are not stated in the extracted record, including leakage treatment, buffer pool coverage, monitoring period, and baseline reassessment, which limits confidence in the claim quality.
Project Description
Developer: Orange Renewable Power Pvt Ltd Type: Other Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2017-08-04 → 2029-08-03 Estimated annual credits: 84421 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action, Goal 7: Affordable and Clean Energy
Red Flags
- Leakage is marked as not addressed, with no quantified deduction or justification found in the extracted record.
- No buffer pool percentage, monitoring period, or baseline reassessment date was found, leaving permanence and MRV completeness only partially documented.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 24,673 | 24,673 | 0 | |
| 2018 | 85,105 | 85,105 | 0 | |
| 2019 | 84,137 | 84,137 | 0 | |
| 2020 | 86,086 | 86,065 | 21 | |
| 2021 | 82,587 | 0 | 82,587 | |
| 2022 | 84,711 | 0 | 84,711 | |
| Total | 447,299 | 279,980 | 167,319 |
Cosa migliorerebbe questo punteggio
- Provide the monitoring report and registry extracts showing verified emission reductions, monitoring period, and any reconciliation between claimed and verified credits.
- Document leakage treatment, buffer pool coverage or other reversal safeguards, and any baseline reassessment or methodology application details.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No buffer pool or reversal detail stated
Leakage not addressed
Project baseline stated, reassessment timing missing
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →