40 MW Orange Charanka Solar Power Project in Gujarat, India
GS-1377 ↗ · current registry ID: GS5866
#243of 1935 in Renewable energy#121of 975 in India#90of 1801 in Gold Standard (GS)#176of 1287 in ACM0002
Audit Analysis
A 40 MW solar PV avoidance project under Gold Standard with VVB-confirmed additionality and a recent grid emission factor, but hampered by a missing leakage justification, an unverified ERR figure, and seven cross-document contradictions that reduce confidence in the data record. The project is CORSIA-eligible and uses a standard methodology (ACM0002 v17.01), but the absence of a verified emissions reduction figure and the unresolved discrepancy between claimed ERR values (380,092 vs 167,298) create meaningful over-crediting uncertainty.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (2024-05-29), while the monitoring report (2024-05-07) claims it was 'deemed negligible' — the higher-priority verification report does not support the 0% deduction
- No verified ERR figure is available (total_err_verified is absent from the record), and the two claimed ERR values (380,092 from the appendix dated 2024-12-07 and 167,298 from the monitoring report dated 2024-05-07) differ by a factor of 2.3, making it impossible to confirm the actual emissions reduction delivered
- Three Corrective Action Requests were raised in the verification report, indicating unresolved compliance issues at the time of verification
- Seven contradictions across documents (leakage, baseline method, ERR, additionality test, FPIC, reversal events, crediting period) signal inconsistent record-keeping
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 24,673 | 24,673 | 0 | |
| 2018 | 85,105 | 85,105 | 0 | |
| 2019 | 84,137 | 84,137 | 0 | |
| 2020 | 86,086 | 86,065 | 21 | |
| 2021 | 82,587 | 0 | 82,587 | |
| 2022 | 84,711 | 0 | 84,711 | |
| Total | 447,299 | 279,980 | 167,319 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification not addressed in verification report
Project-specific baseline, reassessed 2024
FPIC conducted, grievance mechanism present
CORSIA-eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →