Registry document
Final_MR_Bandirma WPP_v05_12-12-2024 clean
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 60 MW Bandirma Wind Power Plant Project (GS-1170)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Final_MR_Bandirma WPP_v05_12-12-2024 clean.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.9/10Rated
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Final_MR_Bandirma WPP_v05_12-12-2024 clean (Monitoring Report), 60 MW Bandirma Wind Power Plant Project (GS-1170). CarbonMeld copy, retrieved from the registry on 17 Apr 2026: https://carbonmeld.com/projects/docs/60-mw-bandirma-wind-power-plant-project-7b096f/250896d52934ffd9/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
